HOT Wallet — Multi-Chain Security & Web3 Freedom
HOT Wallet is your secure multi-chain gateway to Web3.
Powered by MPC security and compatible with Ledger hardware wallets, it gives you complete control of your assets — without compromises.
Manage, swap, and bridge crypto across leading blockchains like BTC, ETH, TON, NEAR, Solana, TRON, BNB and more — all in one app.
Do More With Your Crypto
- Multi-chain freedom: one wallet for all your assets, from Bitcoin to NFTs
- MPC protection: advanced multi-party computation keeps your keys safe on-device
- Ledger support: connect your hardware wallet for maximum security
- Refuel gas: instantly top up transaction fees across chains
- Swap & bridge: move tokens cross-chain with just a few taps
- Rewards layer: unlock progress and bonuses through your activity
- Widgets: monitor balances and networks right from your home screen
- dApp connect: interact with DeFi, NFTs, and Web3 apps securely
Supported Networks
Bitcoin (BTC), Ethereum (ETH), BNB Chain, Solana (SOL), TON, TRON (TRX), NEAR, Polygon (MATIC), Avalanche (AVAX), Arbitrum, Optimism and more.
Supported Tokens
USDT, USDC, DAI, wBTC, BNB, ETH, SOL, TON, NEAR, TRX, MATIC, AVAX, DOGE, SHIB, PEPE, NFT collections and thousands more.
Always With You
- 24/7 support: loved by our users for being fast and reliable
- Cross-device sync: start on one device and continue on another seamlessly
- Non-custodial security: your keys, your control
Join the HOT Community
Follow us on Twitter @hotdao_ and stay close to the latest Web3 updates, airdrops, and features.
Why HOT Wallet
Unlike other wallets, HOT combines enterprise-grade security with everyday usability. Whether you are importing an existing seed phrase, connecting your Ledger, or starting fresh, HOT makes it simple — for both new users and advanced traders.
Download HOT Wallet today — experience multi-chain freedom, MPC security, and a smarter way to Web3.
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute