Chirp GPS Tracker, Locator Map

Chirp GPS Tracker, Locator Map

Download on App Store
Logo of Chirp GPS Tracker, Locator Map

Chirp GPS Tracker: Professional-Grade Safety and Real-Time Location Intelligence

Protect your family and manage your business with military-grade encrypted tracking. From 365-day history and geofencing to SOS alerts and crime data, get the total peace of mind that only the most precise GPS technology can provide.

Publisher

MoonBeam Development

Category

Travel

Downloads

557K+

User Rating

4.1/5

Total Ratings

900

Locales

2

Your Safety Command Center

Discover the interface used by 557K+ users.

Chirp GPS app screen displaying real-time location tracking for family and fleets

Chirp GPS app screen displaying real-time location tracking for family and fleets

Smartphone screen showing Chirp GPS real time tracking map with speed and location data

Smartphone screen showing Chirp GPS real time tracking map with speed and location data

Chirp GPS app interface showing route history map with speed and distance details

Chirp GPS app interface showing route history map with speed and distance details

A detailed log of driving history showing mileage top speed and stop locations in the Chirp GPS app

A detailed log of driving history showing mileage top speed and stop locations in the Chirp GPS app

Large red emergency SOS panic button widget for the Chirp GPS app on iPhone

Large red emergency SOS panic button widget for the Chirp GPS app on iPhone

Chirp GPS app interface showing how to create unlimited geofencing alerts for specific locations on a map

Chirp GPS app interface showing how to create unlimited geofencing alerts for specific locations on a map

Pro-Grade Tracking for What Matters Most

The tools that make this app stand out, trusted by 557K+ users.

🛡️

Real-Time Safety & Smart Alerts

Protect your loved ones with unlimited geofence alerts and an SOS panic button that sends instant location data during emergencies.

📅

365-Day Location History

Go beyond the standard 30-day limit with a full year of movement data, ideal for monitoring long-term patterns or tax-compliant mileage tracking.

🔍

Advanced Situational Awareness

See the full picture with integrated crime, weather, and elevation data layered directly onto your map for superior environmental context.

About the app

Everything you need to know about Chirp GPS Tracker, Locator Map.

Description

Shouldn’t GPS tracking be easy? Chirp GPS makes finding your family, friends, or anyone simple, fun, and safe with powerful, accurate GPS technology. Stay connected and in control with real-time location tracking, personalized alerts, and advanced geofencing. Whether you’re keeping family members safe, managing employees, or tracking devices, Chirp GPS gives you precise, private location data when it matters most. Chirp GPS includes a full range of safety and tracking features: - Real-time GPS location tracking for anyone - 365 days of detailed location history - Track people even if they don’t have the app installed - Unlimited geofence place alerts - View speed, direction, and distance from you - Review route and driving history - See elevation, weather, crime, and regional data - Works on all phones, all carriers, and on the web at ChirpGPS.com - Lock Chirp GPS as a dedicated tracking device that can’t be turned off - SOS panic button to alert family or emergency contacts - One-tap check-ins and movement alerts - Create and share private events - View distance between people and places - Find lost or stolen phones with a loud alert sound - Switch between satellite and street map views - Full-screen car HUD map with compass and speedometer - Private messaging and secure group communication - Military-grade encrypted GPS tracking - With Chirp GPS Premium you get access to all advanced features including: - Full 365-day location history for everyone you follow - Unlimited alerts and geofences - Trip and mileage tracking - Find people by phone number - Extended reporting tools and analytics Start your free 7-day trial today. Subscriptions renew monthly or yearly. You can cancel anytime in your iTunes Account Settings. Continued use of GPS in the background may decrease battery life. Chirp GPS uses advanced battery-efficient location technology to preserve power as much as possible. A subscription to Chirp GPS Premium is required for some features. Payment will be charged to your iTunes Account at confirmation of purchase. Subscription automatically renews unless auto-renew is turned off at least 24 hours before the end of the current period. Account will be charged for renewal within 24 hours before the end of the current period. Subscriptions may be managed by the user and auto-renewal turned off in Account Settings after purchase. Any unused portion of a free trial period will be forfeited when a subscription is purchased. Privacy Policy: https://chirpgps.com/page/127/privacy-policy/ Terms of Use: https://chirpgps.com/page/145/Terms-of-Use/

Latest Version

8.2

Size

23.4 MB

First Released

Apr 15, 2013

Protect Your World with Precision

Join over 500,000 families and business owners who trust Chirp GPS for real-time safety, 365-day history, and military-grade security. Start your 7-day free trial today and experience total peace of mind.

Download on App Store

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute