HMI Viewer

HMI Viewer

Download on App Store
Logo of HMI Viewer

HMI Viewer: Professional Real-Time Monitoring for Your PLC Systems

Securely access and interact with your industrial or irrigation processes from anywhere. Experience a high-performance, native interface designed for the reliability your operations demand.

Download on App Store

Publisher

Rite Irrigation LLC

Category

Business

Downloads

28K+

User Rating

1.0/5

Total Ratings

0

Locales

2

Precision at a Glance

Discover the interface used by 28K+ users.

HMI Viewer app splash screen with industrial dial logo

HMI Viewer app splash screen with industrial dial logo

HMI Viewer welcome dialog providing login and account management instructions

HMI Viewer welcome dialog providing login and account management instructions

HMI Viewer app settings and storage menu interface

HMI Viewer app settings and storage menu interface

A technical dashboard on the HMI Viewer app showing gauges, trend graphs, and industrial control indicators.

A technical dashboard on the HMI Viewer app showing gauges, trend graphs, and industrial control indicators.

HMI Viewer project status screen displaying system diagnostics and administrator login

HMI Viewer project status screen displaying system diagnostics and administrator login

Total Visibility Across Your Operations

The tools that make this app stand out, trusted by 28K+ users.

📱

Remote Real-Time Monitoring

Keep eyes on your pumps, pivots, or plant floor without leaving your truck. Reduce downtime with instant access to live data on your iPhone or iPad.

⚙️

Universal PLC Compatibility

One app for all your hardware. Our native engine supports all major PLC brands, giving you a unified and responsive interface for diverse infrastructure.

🛡️

Secure, View-Only Deployment

Empower your team with one-tap project downloads. Grant operators the visibility they need while keeping your core system logic safe and unaltered.

About the app

Everything you need to know about HMI Viewer.

Description

HMI is the view only version of our HMI system (HMI and HMI Editor). With the HMI Editor app integrators create efficient, advanced, highly responsive "Human Machine Interfaces" and deploy securely to end users's devices who are able to run projects specifically designed for them. As an end user you can download your projects with a single tap of your finger and interact with your Programmable Logic Controllers (PLCs) controlled processes as you never did before. The HMI Editor and HMI apps are fully native and support all major Programmable Logic Controller (PLC) brands.

Latest Version

0.5.4

Size

10.5 MB

First Released

Feb 13, 2018

Secure Remote Monitoring at Your Fingertips

Join thousands of irrigation and industrial professionals using HMI Viewer for reliable, native PLC monitoring. Download your projects with a single tap and keep your operations running smoothly from your iPad or iPhone.

Download on App Store

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute