Titanic 4D Simulator

Titanic 4D Simulator

Download on App Store
Logo of Titanic 4D Simulator

Titanic 4D Simulator: Step Aboard the World’s Most Legendary Liner

Explore every deck, drive the ship, and witness the sinking in a breathtakingly immersive historical experience designed for fans and historians alike.

Download on App Store

Publisher

Gennady Bortnik

Category

Games

Downloads

22K+

User Rating

4.2/5

Total Ratings

1K+

Locales

1

Step Aboard the Legend

Discover the interface used by 22K+ users.

3D virtual walking tour of the Titanic deck in the mobile simulator app.

3D virtual walking tour of the Titanic deck in the mobile simulator app.

Side view of the Titanic ship in the 4D simulator app

Side view of the Titanic ship in the 4D simulator app

A 3D simulation of the Titanic in the Harland and Wolff shipyard ready for launch.

A 3D simulation of the Titanic in the Harland and Wolff shipyard ready for launch.

A 3D simulation of the Titanic at the dock on a mobile device

A 3D simulation of the Titanic at the dock on a mobile device

3D simulation of the Titanic Pump House and historical shipyard dry dock

3D simulation of the Titanic Pump House and historical shipyard dry dock

A screenshot of the Titanic 4D Simulator showing the ship sailing with on-screen steering wheel and speed controls

A screenshot of the Titanic 4D Simulator showing the ship sailing with on-screen steering wheel and speed controls

3D virtual tour of the Titanic Deck D reception room and grand staircase

3D virtual tour of the Titanic Deck D reception room and grand staircase

The Titanic ship sailing across the ocean at night in the Titanic 4D Simulator app

The Titanic ship sailing across the ocean at night in the Titanic 4D Simulator app

Simulation of the Titanic sinking at night with lifeboats in the water

Simulation of the Titanic sinking at night with lifeboats in the water

A 3D simulation showing the bow of the Titanic wreck on the ocean floor within the Titanic 4D Simulator app

A 3D simulation showing the bow of the Titanic wreck on the ocean floor within the Titanic 4D Simulator app

The Most Authentic Titanic Experience

The tools that make this app stand out, trusted by 22K+ users.

🚢

Breathtaking Virtual Tours

Walk the outer decks and explore iconic interiors like the Deck D Reception Room in high-fidelity 4D simulation.

ā˜øļø

Authentic Command & Control

Go beyond exploration by taking the helm to drive the ship or descending into the massive, detailed engine room.

āš“

Witness Living History

Relive the dramatic sinking sequence or dive deep to explore the haunting beauty of the wreck on the ocean floor.

About the app

Everything you need to know about Titanic 4D Simulator.

Description

Take an amazing walk along the outer decks of the famous and legendary passenger liner on your smartphone! This virtual tour allows you to fully immerse yourself in the atmosphere that so briefly reigned on this ship. Free version: - Look at the entire Titanic from the outside - Fly over the whole ship - Harland & Wolff, Titanic Launch - Titanic Dock and Pump House - Engine Room Premium version: - Deck D (Reception room) - Drive the Titanic - Titanic at night - Sinking of the Titanic - Wreck of the Titanic

Latest Version

26.0.0

Size

627.5 MB

First Released

Sep 5, 2022

Ready to Board the Ship of Dreams?

Join over 22,000 history enthusiasts and maritime explorers. Download Titanic 4D Simulator now to walk the legendary decks and experience the liner's history from your iPhone or iPad.

Download on App Store
FAQ

Frequently Asked Questions

Everything you need to know about Titanic 4D Simulator

What is the Titanic 4D Simulator app?

Titanic 4D Simulator is a virtual tour application that allows users to explore the legendary passenger liner, the Titanic, directly on their smartphone.

What content is available in the free version of Titanic 4D Simulator?

The free version of Titanic 4D Simulator includes exploring the Titanic's exterior, flying over the ship, and viewing the Harland & Wolff launch, Titanic Dock, Pump House, and Engine Room.

What additional features are in the premium version of Titanic 4D Simulator?

The premium version of Titanic 4D Simulator offers access to Deck D (Reception room), the ability to drive the Titanic, night mode, the sinking simulation, and the wreck of the Titanic.

Can I drive the Titanic in the Titanic 4D Simulator app?

Yes, users can drive the Titanic. The ability to "Drive the Titanic" is an exclusive feature available within the premium version of the Titanic 4D Simulator app.

Does Titanic 4D Simulator feature a sinking simulation?

Yes, the Titanic 4D Simulator app includes a "Sinking of the Titanic" simulation. This immersive feature is part of the premium version content.

Can users explore the wreck of the Titanic in the app?

Yes, the Titanic 4D Simulator app features content that allows users to explore the "Wreck of the Titanic." This specific experience is available in the premium version.

Are there interior views available in Titanic 4D Simulator?

Yes, Titanic 4D Simulator includes interior views. Specifically, users can access "Deck D (Reception room)" as part of the app's premium version features.

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute