Publisher
Category
Health & FitnessDownloads
83K+User Rating
Total Ratings
2K+Locales
2Discover the interface used by 83K+ users.
The tools that make this app stand out, trusted by 83K+ users.
Master every move with 'Eye-Trainer.' Our AI monitors your posture through your camera, providing instant corrections to prevent injury and maximize results.
Get a 100% personalized diet plan engineered from thousands of nutritional resources. No more generic meal plans—just science-backed fuel for your body.
Full Apple Health and Watch integration. Track your workouts, blood pressure, and daily activity in one centralized dashboard built for data-driven achievers.
Everything you need to know about iTrainer: Diet & Exercise AI.
Description
Latest Version
8.9.4
Size
149.7 MB
First Released
May 11, 2021
Top-ranked apps in the same category
Strava Inc.
FLO HEALTH UK LIMITED
YAZIO GmbH
MyFitnessPal, Inc.
Beijing Xiaomi Co., Ltd
Xiamen Meet You Co., Ltd.
Viral Development LLC
Yuca
REFACE LITHUANIA UAB
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute