Liftly - Voice Workout Logging

Liftly - Voice Workout Logging

Logo of Liftly - Voice Workout Logging

Liftly - Voice-Powered AI Workout Tracker

Stop typing between sets. Log your workouts naturally with your voice, analyze your physique with AI, and dominate your strength rankings from Bronze to Elite.

Publisher

Kvilt AB

Category

Health & Fitness

Downloads

0

User Rating

1.0/5

Total Ratings

0

Locales

1

The Lab for Your Gains

Discover the interface used by 0 users.

Liftly app interface showing voice activated gym logging and barbell bench press sets

Liftly app interface showing voice activated gym logging and barbell bench press sets

Liftly app dashboard showing body transformation progress photos and AI physique metrics

Liftly app dashboard showing body transformation progress photos and AI physique metrics

Liftly app insights screen showing a barbell bench press progress chart and Diamond II strength rank

Liftly app insights screen showing a barbell bench press progress chart and Diamond II strength rank

Liftly app training distribution screen with muscle heatmap and radar chart

Liftly app training distribution screen with muscle heatmap and radar chart

Liftly app interface showing an AI training coach suggesting a high intensity chest and back workout routine

Liftly app interface showing an AI training coach suggesting a high intensity chest and back workout routine

Train Smarter with AI-Driven Performance

The tools that make this app stand out, trusted by 0 users.

🎙️

Hands-Free Voice Logging

Stop fumbling with your phone between sets. Just speak your reps and weight naturally through your AirPods to log your progress instantly.

📸

AI Physique Scoring

Go beyond the scale with AI-powered body analysis. Get objective insights into muscle symmetry and physique breakdowns from your photos.

🏆

Elite Strength Rankings

Level up your status from Bronze to Elite. Track your performance across major lifts and share beautiful rank cards with your community.

About the app

Everything you need to know about Liftly - Voice Workout Logging.

Description

LIFT SMARTER, NOT HARDER Liftly is the AI-powered workout tracker that eliminates the hassle of logging exercises. Just speak your sets naturally, and let AI handle the rest. VOICE-POWERED LOGGING Say "3 sets of bench press, 185 pounds, 8 reps" and Liftly logs everything. No typing between sets. AI TRAINER & ROUTINES Get personalized advice and let AI generate optimized routines based on your workout history and weak points. AI BODY ANALYSIS Snap front, back, and side photos for AI-powered physique scoring, muscle breakdowns, and actionable training insights. STRENGTH RANKINGS Track your rank from Bronze to Elite across major lifts. Celebrate milestones and share rank cards with friends. RECOVERY TRACKING Real-time muscle recovery monitoring tells you when you're ready to train again. PROGRESS & ANALYTICS Charts, personal records, volume trends, and fun stats to visualize your fitness journey. PLUS - Workout sharing with beautiful summary cards - Time-based exercises (planks, holds, isometrics) - Routine folders and custom exercises - Import workouts from other apps - Progress photos and body measurements - Dark mode and iPad support - Cloud sync across all devices PRIVACY FIRST Your data is encrypted, secure, and never shared with third parties. Download Liftly and experience the future of workout tracking. Your first two weeks are on us. --- TERMS & PRIVACY Terms of Use: https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Privacy Policy: Available in apps settings or https://kviltapps.com/privacypolicy Questions or feedback? Contact us at folke.bernroth@icloud.com

Latest Version

1.1.1

Size

88.7 MB

First Released

Nov 24, 2025

Ready to Level Up Your Training?

Ditch the manual logging and let AI handle the data while you focus on the weight. Download Liftly and start your 14-day free trial today.

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute