MY Risk Assessments

MY Risk Assessments

Download on App Store
Logo of MY Risk Assessments

MY Risk Assessments: Streamline Field Compliance and Workplace Safety

Ditch the paperwork and eliminate double-entry. Create detailed assessments, assign corrective actions on-site, and sync instantly with your MY Compliance Management portal for a safer, audit-ready workplace.

Download on App Store

Publisher

Access UK Ltd

Category

Business

Downloads

100+

User Rating

1.0/5

Total Ratings

0

Locales

1

Safety at Your Fingertips

Discover the interface used by 100+ users.

Risk rating matrix screen showing a color coded grid for calculating hazard levels

Risk rating matrix screen showing a color coded grid for calculating hazard levels

A detailed hazard report within the MY Risk Assessments app showing risk ratings before and after control measures for a biohazard

A detailed hazard report within the MY Risk Assessments app showing risk ratings before and after control measures for a biohazard

A mobile interface showing the Edit Risk screen within the MY Risk Assessments app, featuring options for control measures and safety icons.

A mobile interface showing the Edit Risk screen within the MY Risk Assessments app, featuring options for control measures and safety icons.

Mobile app interface of MY Risk Assessments showing required safety equipment including ear plugs and face shields

Mobile app interface of MY Risk Assessments showing required safety equipment including ear plugs and face shields

Details screen of the MY Risk Assessments mobile app displaying assessment summary dates and contact information

Details screen of the MY Risk Assessments mobile app displaying assessment summary dates and contact information

Interface of MY Risk Assessments app showing risk register details and assessment management buttons.

Interface of MY Risk Assessments app showing risk register details and assessment management buttons.

Streamline Your Safety Inspections

The tools that make this app stand out, trusted by 100+ users.

📱

Field-Ready Documentation

Ditch the clipboard. Create detailed risk assessments directly from your mobile device or tablet anywhere on-site, even offline.

⚠️

Immediate Accountability

Don't just identify risks—assign corrective actions on the spot to ensure every hazard is mitigated before you leave the site.

🔄

Audit-Ready Data Sync

Bridge the gap between field and office with seamless uploads to your portal, creating a secure, legal digital paper trail.

About the app

Everything you need to know about MY Risk Assessments.

Description

This app allows you to download and create risk assessments from your MY Compliance Management portal. You can create risk assessments and assign actions then when you have finished simply upload it to your portal.

Latest Version

1.1.9

Size

31.0 MB

First Released

Oct 29, 2019

Ready to Streamline Your Site Safety?

Stop chasing paper trails. Download MY Risk Assessments to create reports, assign actions, and sync field data directly to your portal in real-time.

Download on App Store

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute