Quit Smoking – Eleos

Quit Smoking – Eleos

Download on App Store
Logo of Quit Smoking – Eleos

Quit Smoking – Eleos: Master Your Cravings without the Shame

Stop the cycle of relapse with a system built for real life. Use science-backed CBT coaching to reframe your thoughts, track triggers in seconds, and watch your savings grow—no lectures, just progress.

Download on App Store

Publisher

Jaya Pandey

Category

Health & Fitness

Downloads

0

User Rating

1.0/5

Total Ratings

0

Locales

4

A Closer Look at Your Progress

Discover the interface used by 0 users.

Eleos app welcome screen with a pink floral design and sign in with apple button

Eleos app welcome screen with a pink floral design and sign in with apple button

Eleos app dashboard featuring a 12 day smoke free streak and AI powered craving coaching

Eleos app dashboard featuring a 12 day smoke free streak and AI powered craving coaching

Eleos app interface for logging smoking cravings and tracking triggers

Eleos app interface for logging smoking cravings and tracking triggers

AI powered craving analysis and daily tracking charts in the Eleos app

AI powered craving analysis and daily tracking charts in the Eleos app

Eleos app interface showing a list of health milestones achieved after quitting smoking

Eleos app interface showing a list of health milestones achieved after quitting smoking

Onboarding screen of the Eleos quit smoking app featuring a pink flower icon and a sign in with apple button

Onboarding screen of the Eleos quit smoking app featuring a pink flower icon and a sign in with apple button

Eleos app screenshot displaying AI-powered coaching and a dashboard with a lung illustration for smoking cessation.

Eleos app screenshot displaying AI-powered coaching and a dashboard with a lung illustration for smoking cessation.

Interface of the Eleos app for logging smoking cravings and triggers

Interface of the Eleos app for logging smoking cravings and triggers

Detailed craving analysis and progress charts on the Quit Smoking Eleos mobile app interface.

Detailed craving analysis and progress charts on the Quit Smoking Eleos mobile app interface.

Health milestones and progress tracking screen in the Eleos quit smoking app.

Health milestones and progress tracking screen in the Eleos quit smoking app.

Master Your Urges, One Craving at a Time

The tools that make this app stand out, trusted by 0 users.

🧠

CBT-Powered Coaching

Get instant, science-backed strategies to reframe your thoughts and stay in control the moment a craving strikes.

💰

Track Your Financial Freedom

Watch your daily savings accumulate in real-time and turn the cost of smoking into a tangible reward for your progress.

📈

Smart Trigger Mapping

Identify the specific stress points and routines that drive your habits, turning every urge into data for your personalized quit plan.

About the app

Everything you need to know about Quit Smoking – Eleos.

Description

Cravings hit fast. Eleos helps you hit back smarter. Log the moment, understand the trigger, and get supportive CBT-style coaching. Build streaks, track savings, and turn slips into data, not shame. Full Description (plain text) Eleos is a craving-first quit smoking app built for real life: messy days, loud urges, and the moments where willpower isn’t enough. When a craving hits, you don’t need a lecture. You need a quick reset, a clearer thought, and a plan for the next 10 minutes. Eleos helps you do that by making craving logging effortless, and coaching you with a CBT-informed approach. WHAT YOU GET • Instant Craving Log: capture the urge in seconds • CBT-Style Coaching: reframe thoughts, reduce panic, choose a next action • Trigger Tracking: learn what sets you off (stress, places, people, routines) • Competing Activities: swap the cigarette for something doable right now • Milestones & Streaks: see progress that actually motivates • Money Saved: watch your “cost of smoking” turn into real savings • Journal Mode: reflect, track patterns, and build a personal quit playbook • Gentle Reminders (optional): supportive nudges, not guilt DESIGNED FOR • People who relapse and want a system, not shame • People who want structure without perfection • People who want progress you can measure PRIVACY Your data is yours. Use Eleos as privately as you want. Medical note: Eleos supports habit change and coping skills. It’s not a substitute for professional medical advice. CALL IT WHAT IT IS A craving isn’t a moral failure. It’s a moment. Log it. Learn it. Beat it. Terms of Use (EULA): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Privacy Policy: https://www.cerouno.quest/privacy

Latest Version

1.0.1

Size

25.2 MB

First Released

Jan 13, 2026

Beat the Craving, Not Yourself

Ready for a quit attempt that actually sticks? Download Eleos now to transform your next urge into progress with CBT-style tools, real-time tracking, and zero judgment.

Download on App Store

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute