Take command of your stamina with the only training app designed for men. Unlock longer-lasting sessions, stronger erections, and ultimate confidence through targeted Kegel and Reverse Kegel exercises.
Publisher
Category
Health & FitnessDownloads
295K+User Rating
Total Ratings
2K+Locales
1Discover the interface used by 295K+ users.
The tools that make this app stand out, trusted by 295K+ users.
Master both Kegels and Reverse Kegels to gain the unique ability to slow down or power up exactly when you want.
Start at your own pace and level up as you get stronger, turning your fitness journey into measurable sexual mastery.
Build a life-changing habit with private notifications that ensure you never miss a session, no matter how busy you are.
Everything you need to know about Stamena - Longer lasting sex.
Description
Latest Version
1.4.6
Size
283.0 MB
First Released
May 13, 2016
Top-ranked apps in the same category
Strava Inc.
FLO HEALTH UK LIMITED
YAZIO GmbH
MyFitnessPal, Inc.
Beijing Xiaomi Co., Ltd
Xiamen Meet You Co., Ltd.
Viral Development LLC
Yuca
REFACE LITHUANIA UAB
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute