Join the next generation of urban mobility with carbon-neutral e-scooters engineered for stability. Experience a smoother commute with our triple-braking system and safety-first design, built for the conscious urban explorer.
Publisher
Category
TravelDownloads
0User Rating
Total Ratings
0Locales
40Discover the interface used by 0 users.
The tools that make this app stand out, trusted by 0 users.
Experience a smoother, safer ride with our signature wide-deck design and triple-braking system engineered for maximum control.
Make an impact with 100% carbon-neutral rides that replace car trips and align with your sustainable lifestyle.
Ride worry-free with onboard intelligence that performs 1,000+ safety checks every second to ensure total vehicle reliability.
Everything you need to know about Superpedestrian LINK Scooters.
Description
Latest Version
7.1.2
Size
106.0 MB
First Released
Jan 21, 2020
Top-ranked apps in the same category
Uber Technologies, Inc.
ACADEMY OF RAILWAY SCIENCES CO., ltd.
Airbnb, Inc.
Booking.com B.V.
GRABTAXI HOLDINGS PTE. LTD.
Didi Chuxing (Beijing) Network Platform Technology Co., Ltd
BOLT TECHNOLOGY OU
Shanghai Ctrip Commerce Co.,Ltd
Trip.com Travel Singapore Pte. Ltd.
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute