ADR System
ADR System
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of ADR System
Download on App Store

ADR System

Unlock elite insights with real-time Velocity-Based Training (VBT) and jump metrics. Connect wirelessly to your ADR hardware to manage multiple athletes, track 1RM, and optimize power—all in one free, unlimited platform.

Key Figures

Downloads

10K+

User Rating

3.8/5

Total Ratings

0

Publisher

Lucia Escobar Morales

Category

Sports

Locales

1

Latest Version

6.0.5

Size

18.3 MB

First Released

Jun 17, 2020
Features

Master Human Performance with Precision Data

The all-in-one professional ecosystem for Velocity-Based Training and plyometric monitoring, designed for coaches who demand elite results without the subscription fatigue.

Real-Time Velocity-Based Training

Dial in the perfect load every session. Get instant feedback on lifting velocity and daily 1RM estimations to optimize strength gains and prevent overtraining.

Advanced Jump & Power Analytics

Quantify explosiveness by measuring flight time, jump height, and Reactive Strength Index (RSI) to monitor your athletes' neurological readiness.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

ADR System - ADR System mobile app login screen with language options and email input fields

ADR System mobile app login screen with language options and email input fields

ADR System - The main menu interface of the ADR System app showing training tests and coach settings.

The main menu interface of the ADR System app showing training tests and coach settings.

ADR System - Interface of the ADR System app showing a list of managed athletes for a strength and conditioning coach.

Interface of the ADR System app showing a list of managed athletes for a strength and conditioning coach.

ADR System - ADR System mobile app interface for configuring velocity-based training and 1RM estimation parameters

ADR System mobile app interface for configuring velocity-based training and 1RM estimation parameters

ADR System - ADR System mobile app interface showing velocity and power metrics for bench press repetitions

ADR System mobile app interface showing velocity and power metrics for bench press repetitions

ADR System - A real-time bar chart within the ADR System app displaying propulsive velocity metrics in meters per second for a weightlifting set.

A real-time bar chart within the ADR System app displaying propulsive velocity metrics in meters per second for a weightlifting set.

ADR System - ADR System training history screen showing a list of past workouts and progress reports

ADR System training history screen showing a list of past workouts and progress reports

ADR System - Training history log in ADR System displaying performance metrics like velocity and range of motion for a full body session.

Training history log in ADR System displaying performance metrics like velocity and range of motion for a full body session.

ADR System - Strength training progress dashboard in the ADR System app featuring exercise metrics and a 1RM evolution line graph.

Strength training progress dashboard in the ADR System app featuring exercise metrics and a 1RM evolution line graph.

ADR System - Interface of the ADR System app showing a selection of strength exercises for performance testing.

Interface of the ADR System app showing a selection of strength exercises for performance testing.

Description

ADR System es una aplicación diseñada para conectarse de forma inalámbrica mediante Bluetooth a tus dispositivos ADR Encoder y ADR Jumping, facilitando el monitoreo y la optimización de tus entrenamientos de fuerza y valoraciones de salto. Dispón en tu teléfono móvil de toda la información sobre el rendimiento de tus deportistas de manera rápida y visual. Esta aplicación integra los datos de ADR Encoder y ADR Jumping en una única plataforma, permitiéndote medir métricas clave como el índice de fuerza reactiva, el 1RM estimado diario, el tiempo de vuelo o la altura de salto. También podrás crear perfiles carga-velocidad personalizados, guardar tus entrenamientos y gestionar múltiples atletas con facilidad. Todo esto sin límite de almacenamiento y de forma totalmente gratuita.

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.