AYUN GPS SERVER

AYUN GPS SERVER

Download on App Store
Logo of AYUN GPS SERVER

AYUN GPS SERVER: The Ultimate Mobile Command Center for Fleet and Asset Tracking

Empower your logistics and security operations with real-time GPS oversight, integrated video monitoring, and instant alerts. Stay in total control of your business assets and personnel from anywhere in the world.

Download on App Store

Publisher

Mohannad Haddad

Category

Navigation

Downloads

0

User Rating

1.0/5

Total Ratings

0

Locales

1

Command at Your Fingertips

Discover the interface used by 0 users.

Login screen for Ayun GPS Server fleet management app showing username and password fields

Login screen for Ayun GPS Server fleet management app showing username and password fields

Live GPS tracking interface showing vehicle route and detailed location data on a satellite map.

Live GPS tracking interface showing vehicle route and detailed location data on a satellite map.

Live map view showing multiple tracked assets and detailed vehicle status in AYUN GPS SERVER

Live map view showing multiple tracked assets and detailed vehicle status in AYUN GPS SERVER

A fleet management dashboard showing a list of tracked vehicles with their real-time speed and connection status.

A fleet management dashboard showing a list of tracked vehicles with their real-time speed and connection status.

AYUN GPS SERVER history screen showing filters for object tracking time periods and stop durations

AYUN GPS SERVER history screen showing filters for object tracking time periods and stop durations

Screenshot of the AYUN GPS SERVER events log displaying real-time alerts for vehicle speeding and idling

Screenshot of the AYUN GPS SERVER events log displaying real-time alerts for vehicle speeding and idling

Satellite map interface of AYUN GPS SERVER showing real-time location and status of a Mercedes S400 vehicle including driver and odometer details

Satellite map interface of AYUN GPS SERVER showing real-time location and status of a Mercedes S400 vehicle including driver and odometer details

Interface for sending remote commands to assets within the AYUN GPS SERVER app

Interface for sending remote commands to assets within the AYUN GPS SERVER app

Master Your Operations in Real-Time

The tools that make this app stand out, trusted by 0 users.

🛰️

Live Fleet Visibility

Track asset locations in real-time and access instant iVMS video feeds to ensure security and operational transparency from anywhere.

🔔

Proactive Security Alerts

Stay ahead of risks with custom notifications for geofence violations, speeding, and idle time, allowing for immediate intervention.

📈

Actionable Performance Logs

Generate comprehensive reports and route analytics to optimize fuel consumption, improve driver accountability, and meet compliance standards.

About the app

Everything you need to know about AYUN GPS SERVER.

Description

GPS iVMS Server: Real-Time Tracking & Monitoring Client Track, monitor, and manage your fleet or assets effortlessly with GPS iVMS Server Client – the ultimate mobile companion for iVMS server integration. Key Features: - Live GPS Tracking: View real-time locations of vehicles, assets, or personnel on an intuitive map interface. - Remote Monitoring: Access iVMS server feeds for video surveillance, alerts, and status updates from anywhere. - Custom Alerts: Get instant notifications for geofences, speed limits, idle time, or unauthorized movements. - Detailed Reports: Generate logs, routes, and analytics to optimize operations and ensure compliance. - User-Friendly Design: Secure login, offline mode support, and seamless sync with your iVMS server. Perfect for fleet managers, security teams, logistics pros, and businesses needing reliable GPS oversight. Download now and stay in full control! You must have an account with Ayun Solutions.

Latest Version

6.2

Size

52.3 MB

First Released

Jun 27, 2022

Take Full Command of Your Operations Today

Download the mobile companion for your Ayun Solutions account and monitor your fleet, assets, and live video feeds in real-time from your iPhone or iPad.

Download on App Store

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute