BATUS Batman Ulaşım Sistemleri
BATUS Batman Ulaşım Sistemleri
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of BATUS Batman Ulaşım Sistemleri
Download on App Store

BATUS Batman Ulaşım Sistemleri

Get real-time bus locations, instant NFC balance top-ups, and live schedules at your fingertips. Navigate Batman with the speed and convenience of a local, all from one smart mobile interface.

Key Figures

Downloads

0

User Rating

4.0/5

Total Ratings

0

Publisher

ASIS ELEKTRONIK VE BILISIM SISTEMLERI A S

Category

Travel

Locales

6

Latest Version

2.2.0

Size

29.3 MB

First Released

Jun 13, 2020
Features

Master Your Commute in Batman

Navigate the city like a local with real-time tracking, instant mobile top-ups, and comprehensive route maps designed for the modern traveler.

Live Bus Tracking

Eliminate the guesswork. See exactly where your bus is on the map and arrive at the stop right on time.

Seamless Mobile Top-Ups

Skip the kiosks. Check your balance and reload your transit card instantly using NFC or digital payments.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

BATUS Batman Ulaşım Sistemleri - Main screen of the BATUS Batman transit application showing various public transportation services

Main screen of the BATUS Batman transit application showing various public transportation services

BATUS Batman Ulaşım Sistemleri - A mobile interface of the BATUS app showing options to top up a Batman transit card balance

A mobile interface of the BATUS app showing options to top up a Batman transit card balance

BATUS Batman Ulaşım Sistemleri - Real-time bus tracking interface on a map within the BATUS transit app

Real-time bus tracking interface on a map within the BATUS transit app

BATUS Batman Ulaşım Sistemleri - Mobile screen displaying bus route stops and real time locations in the BATUS Batman transit app

Mobile screen displaying bus route stops and real time locations in the BATUS Batman transit app

BATUS Batman Ulaşım Sistemleri - A mobile app screen showing the daily bus departure schedule for a transit route in Batman Turkey

A mobile app screen showing the daily bus departure schedule for a transit route in Batman Turkey

Description

Toplu ulaşım araç bilgileri, durak bilgileri, sefer bilgileri görüntülenir, Şehir toplu taşıma kartlarına bakiye yüklenebilir ve görüntülenebilir. Ulaşım için ihtiyaç duyduğunuz bilgilere mobilde erişmenizi sağlayan uygulamadır İzin Açıklamaları - İnternet izni : Uygulama merkezi sistem ile internet üzerinden haberleşmektedir. - NFC izni : Yolcu Kart ID'sini okumak için istenmektedir. - Titreşim izni : Yolcu Kart ID'si okunduğunda(NFC destekli telefonlarda) titreşim oluşturmaktadır. - Uyku Modu Kontrol izni : Bakiye limiti için uyarı mesajı geldiğinde cihazı uyku modundan çıkarmak için kullanılmaktadır. - Konum izni : Harita üzerinde konum bilgisinin gösterilmesi için kullanılmaktadır. - Google Bulut Mesajlaşma izni : Bakiye kontrol işlemleri Google bulut üzerinden yapılmaktadır, telefonun şarj ve internet kullanımını minimum seviyede tutmaktadır. Uygulama Fonksiyonları : Otobüsüm Nerede, Bakiye Sorgulama, Bakiye Kontrol, Ücret Tarifesi, Hat Hareket Saatleri, Yetkili Bayi ve Kart Merkezleri, Bakiye Yükleme, İletişim, Favoriler, Şikayetim Var

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.