Never lose sight of your hounds with precision GPS, offline topo maps, and integrated e-collar training—engineered for the rugged demands of the deep woods.
Publisher
Category
NavigationDownloads
8K+User Rating
Total Ratings
0Locales
15Discover the interface used by 8K+ users.
The tools that make this app stand out, trusted by 8K+ users.
Stay connected in the deep woods with Offline and Topographical maps. Track your hounds' exact distance and direction accurately where cell signals fail.
Instantly identify when your dog is on the trail or has treed. Monitor 4-level bark intensity, movement speed, and battery status in real-time.
Manage multiple dogs simultaneously. Reinforce commands with 10 levels of adjustable stimulation, vibration, and light controls directly from your device.
Everything you need to know about eSeek GPS.
Description
Latest Version
1.0.23
Size
71.9 MB
First Released
Jul 21, 2025
Top-ranked apps in the same category
Google LLC
AutoNavi Information Technology Co. Ltd.
waze
Beijing Baidu Netcom Science & Technology Co.,Ltd
Moovit App Global LTD
9280-0366 Quebec inc.
Parkmobile USA, Inc
Shenzhen Tencent Computer Systems Company Limited
GOLDLAB APPLICATIONS YAZILIM VE BILISIM ANONIM SIRKETI
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute