Flight Calculator

Flight Calculator

Download on App Store
Logo of Flight Calculator

Flight Calculator: The Ultimate Digital E6B for Precision Flight Planning

Simplify complex aviation math, track engine times, and log ATIS notes directly on your iPad. Engineered for student and private pilots who prioritize safety and cockpit efficiency.

Publisher

Andrej Hyll

Category

Navigation

Downloads

169K+

User Rating

1.0/5

Total Ratings

0

Locales

1

Precision at a Glance

Discover the interface used by 169K+ users.

A screenshot of the Flight Calculator app showing the basic menu with calculation options for time distance speed and true air speed

A screenshot of the Flight Calculator app showing the basic menu with calculation options for time distance speed and true air speed

Speed calculation interface in the Flight Calculator app showing distance and time input fields with a numeric keypad

Speed calculation interface in the Flight Calculator app showing distance and time input fields with a numeric keypad

Interface of the Flight Calculator app showing calculation options for speed distance and time with a unit selection picker

Interface of the Flight Calculator app showing calculation options for speed distance and time with a unit selection picker

The basic calculation screen of the Flight Calculator app showing speed distance and time input fields for pilots.

The basic calculation screen of the Flight Calculator app showing speed distance and time input fields for pilots.

Elevate Your Cockpit Precision

The tools that make this app stand out, trusted by 169K+ users.

📐

Comprehensive E6B Math

Ditch the manual whiz wheel with instant calculations for True Air Speed, Density Altitude, and Wind Components, reducing your cockpit workload.

✍️

Digital iPad Kneeboard

Optimized for stylus use, the iPad-exclusive notes section lets you record ATIS, clearances, and delivery instructions without fumbling for paper.

Critical Mission Planning

Ensure flight safety with precision fuel burn estimates, Point of No Return (PNR) calculations, and real-time stopwatch tracking for engine and leg times.

About the app

Everything you need to know about Flight Calculator.

Description

Flight Calculator is an app for pilots to perform flight related calculations. iPad version only (choose preferred orientation for Notes in Settings/Flight calc) It is highly recommended to read manual at developer's webpage. If some calculation you need is missing, please contact developer and the calculation will be added as soon as possible. This app contains following calculations: Distance, time, speed Addition, subtraction of time Turn calculation True air speed Fly by turn distance Reciprocal heading Pressure altitude Density altitude True altitude Ground speed when climbing or descending Climb or descent rate Distance for climb or descent Wind components Wind related calculations Point of No Return Critical Point Fuel calculation Unit Converter LatLong, MGRS and UTM coordinates conversion Only for iPad: Notes (ATIS, Delivery, Free format) (Stylus recommended) Stopwatch (To track flight and engine time) The icons for bottom bar were used from http://icons8.com

Latest Version

1.6.2

Size

2.0 MB

First Released

Jan 23, 2014

Elevate Your Cockpit Precision

Join 169,000+ pilots who rely on Flight Calculator for accurate planning and real-time navigation. Download the essential iPad tool for your next flight today.

Download on App Store

App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.

Believe this page infringes your intellectual property? File a dispute