HKSOS
HKSOS
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of HKSOS
Download on App Store

HKSOS

Explore the trails with confidence. Connect directly to the 999 Call Centre and share your precise location with emergency rescue teams, even in the most remote conditions.

Key Figures

Downloads

0

User Rating

4.7/5

Total Ratings

0

Publisher

Hong Kong Police Force

Category

Travel

Locales

3

Latest Version

3.0.0

Size

187.1 MB

First Released

Jan 17, 2024
Features

Explore Hong Kong with Total Confidence

Designed for international hikers and adventurers, HKSOS is your direct lifeline to emergency services when every second counts in the great outdoors.

Instant 999 Connection

Trigger a unique SOS signal that alerts the Hong Kong Police 999 Call Centre immediately without the need for voice calls or language barriers.

Precision Location Tracking

Automatically transmit your exact GPS coordinates to rescue teams, ensuring they can reach you swiftly even in dense forests or remote terrain.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

HKSOS - HKSOS emergency rescue mobile application splash screen with SOS icon

HKSOS emergency rescue mobile application splash screen with SOS icon

HKSOS - HKSOS app interface showing the team safety feature with a member list and QR code for group tracking

HKSOS app interface showing the team safety feature with a member list and QR code for group tracking

HKSOS - HKSOS app interface showing real-time location sharing feature on a map for outdoor safety.

HKSOS app interface showing real-time location sharing feature on a map for outdoor safety.

HKSOS - HKSOS app interface showing the real-time location sharing feature with emergency contacts and duration options

HKSOS app interface showing the real-time location sharing feature with emergency contacts and duration options

HKSOS - Mobile interface of the HKSOS app showing different emergency types to report for rescue services.

Mobile interface of the HKSOS app showing different emergency types to report for rescue services.

HKSOS - HKSOS app emergency interface with GPS coordinates and SOS request details

HKSOS app emergency interface with GPS coordinates and SOS request details

HKSOS - HKSOS mobile app interface showing outdoor activity selection for hiking and kayaking with a map background

HKSOS mobile app interface showing outdoor activity selection for hiking and kayaking with a map background

HKSOS - HKSOS app screen showing hiking activity summary with a map route and distance statistics

HKSOS app screen showing hiking activity summary with a map route and distance statistics

HKSOS - HKSOS app interface showing a list of emergency contacts with rescue status and SOS buttons.

HKSOS app interface showing a list of emergency contacts with rescue status and SOS buttons.

HKSOS - HKSOS app screen showing the unique SOS signal and Signal Radar technology for emergency rescue in areas without cellular coverage

HKSOS app screen showing the unique SOS signal and Signal Radar technology for emergency rescue in areas without cellular coverage

Description

What is HKSOS? HKSOS is the most important outdoor safety app designed to save lives and speed up the response time of rescue services in life-critical missions. It is directly linked to the 999 Call Centre and becomes your lifeline in an emergency. HKSOS generates unique SOS signal that can be picked up by emergency units even in extreme conditions. When SOS is triggered via the app, the 999 Call Centre will be alerted and provided with your precise location information so that emergency teams can swiftly reach you for assistance.

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.