Empower your child's imagination through interactive, small-group lessons. Designed for kids aged 5-12, our immersive art classes combine expert instruction with cultural connection to foster artistic skills and cognitive growth from the comfort of home.
Publisher
Category
EducationDownloads
988K+User Rating
Total Ratings
6K+Locales
1Discover the interface used by 988K+ users.
The tools that make this app stand out, trusted by 988K+ users.
With a maximum of 8 students per session, your child receives personalized attention from professional mentors while building social skills with peers.
We move beyond simple imitation to foster critical thinking and spatial reasoning through innovative, imagination-driven art projects that inspire.
Stay connected with session replays, professional feedback, and detailed learning reports that showcase your child's artistic and linguistic growth.
Everything you need to know about 画啦啦美术课堂.
Description
Latest Version
5.23.5
Size
172.7 MB
First Released
Sep 24, 2018
Top-ranked apps in the same category
Duolingo, Inc
DEEP FLOW SOFTWARE SERVICES - FZCO
Wuhan Jiakaobaodian Information Service Co., Ltd.
Toca Boca AB
Google LLC
Guangzhou Polar Future Culture Technology Co., Ltd
Student Information Consultation Service Co., Ltd.
GAUTHTECH PTE. LTD.
Aleksandr Ulitin
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute