Mua日常-情侣手机自动报备定位查岗互动聊天软件
Mua日常-情侣手机自动报备定位查岗互动聊天软件
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of Mua日常-情侣手机自动报备定位查岗互动聊天软件
Download on App Store

Mua日常-情侣手机自动报备定位查岗互动聊天软件

Stay connected with real-time location tracking, home screen photo drops, and virtual movie nights. The all-in-one intimacy app for Gen Z couples to stay close, feel safe, and share every moment.

Key Figures

Downloads

1M+

User Rating

4.8/5

Total Ratings

64K+

Publisher

Chongqing Daimaxiaoying Technology Co., Ltd

Category

Lifestyle

Locales

2

Latest Version

4.7.4

Size

209.0 MB

First Released

Dec 4, 2022
Features

Your Private Digital Sanctuary

Mua bridges the gap between 'I miss you' and 'I'm right here.' Stay connected, stay safe, and build your digital world together.

Always Within Reach

Follow their journey on a 3D satellite map and get notified when they arrive safely—because peace of mind is the ultimate love language.

Live Desktop Moments

Send 'Locket-style' photo updates that land instantly on your partner's home screen. Keep your favorite face just a glance away, all day.

FAQ

Frequently Asked Questions

Everything you need to know about Mua日常-情侣手机自动报备定位查岗互动聊天软件

What is the Mua app?

Mua app is an interactive guardian platform for young couples to record their love life, protect intimacy, and share experiences. It provides tools for location tracking, co-watching, and shared journaling features to enhance relationships.

Can Mua app track my partner's real-time location?

Yes, Mua app offers a "Couple Exclusive Map" feature that displays your partner's precise real-time location using a 3D satellite map. Both partners must provide consent for this function to be active.

Does Mua app keep a history of my partner's movements?

Yes, the Mua app records and allows users to view their partner's movement history for up to 7 days. This feature provides detailed reports on movement patterns and time spent at various locations.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

Mua日常-情侣手机自动报备定位查岗互动聊天软件 - Chat interface of Mua app showing automatic status updates for couples including battery and location

Chat interface of Mua app showing automatic status updates for couples including battery and location

Mua日常-情侣手机自动报备定位查岗互动聊天软件 - Mua app interface showing a shared map with a seven day location history and movement timeline for couples.

Mua app interface showing a shared map with a seven day location history and movement timeline for couples.

Mua日常-情侣手机自动报备定位查岗互动聊天软件 - Mua app screen displaying a partner's live location battery status and daily screen time activity

Mua app screen displaying a partner's live location battery status and daily screen time activity

Mua日常-情侣手机自动报备定位查岗互动聊天软件 - Mua app interface showing real-time location tracking and distance between a couple on a map

Mua app interface showing real-time location tracking and distance between a couple on a map

Mua日常-情侣手机自动报备定位查岗互动聊天软件 - Interface of the Mua app for couples showing features like diary anniversary tracking and relationship goals

Interface of the Mua app for couples showing features like diary anniversary tracking and relationship goals

Description

Mua app,是年轻情侣日常恋爱的互动守护平台,每月有超过百万对情侣在这里记录她们的恋爱时光,守护甜蜜、真实、安全的二人世界,获得甜蜜的情侣恋爱生活 。用户好评度超过96.86% 【情侣专属地图】可实时精准查看对方位置,3D卫星地图实时移动,做背后默默守护Ta的人。历史轨迹动态一键可查,可回看双方7天内的行动轨迹哦。还可标记打卡,在地图上标记想去旅行打卡的地点和值得回忆的地点,一起制作属于情侣间独一无二的浪漫地图。 【同屏追剧看电影】当TA不在身边时,也可以一起同屏追剧看电影,边看边聊,一起来分享你们的甜蜜温馨时刻~ 【情侣贴贴霸屏】专属于两人的Mua亲密互动,用你的甜蜜表情霸占ta的桌面,对象打开手机直接就能看见,爱就是要随时看得到!还能查看对方实时剩余电量,屏幕使用时间,专治消息不回,发送后对象需在30分钟内拍照回应你~ 【Mua情侣日记】两人的专属心情日记,实时同步对方,时刻专注对方的心情变化,记录共同的纪念日,创建情侣相册,每个重要的日子都值得被记录,记录点滴,爱一直会在~ 【情侣恋爱积分】共同制定双方的加减分项,相互督促,共同进步,一起经营甜蜜爱情。完成情侣必做的100件小事,还有超多恋爱测试等你来,看看你心里的爱情是什么样的,灵魂伴侣的必修课,测试一下彼此的爱的默契吧 【温馨提示】 查看对方定位功能需要双方同意方可使用哦。 Mua一下,立刻上线。快来Mua体验甜蜜而有趣的情侣生活吧。 在应用中我们将获取HealthKit或CareKit API的数据,将你的每日移动步数同步给对方。你可选择拒绝,其他功能也可正常使用 隐私政策:https://ndo39wy3hm.feishu.cn/docx/doxcnFe54R31lCfQZjivS2fDfNG?from=from_copylink

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.