UCharge Powered by UNIPET
UCharge Powered by UNIPET
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of UCharge Powered by UNIPET
Download on App Store

UCharge Powered by UNIPET

Locate available stations in real-time, reserve your charger, and pay securely. Take the stress out of charging and join the region’s most innovative EV community.

Key Figures

Downloads

0

User Rating

1.0/5

Total Ratings

0

Publisher

United Independent Petroleum Marketing Co. Ltd

Category

Travel

Locales

1

Latest Version

3.97.1

Size

92.5 MB

First Released

Aug 25, 2023
Features

Everything You Need for a Smarter Drive

Designed for the modern EV owner, U-Charge combines cutting-edge technology with reliable infrastructure to streamline your daily commute.

Real-Time Availability & Reservations

Eliminate range anxiety by locating active chargers in real-time. Secure your spot in advance for a guaranteed, stress-free charge.

Frictionless Digital Payments

Skip the physical cards. Manage your sessions and pay securely within the app using your favorite digital wallet or credit card.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

UCharge Powered by UNIPET - UCharge app map showing EV charging station locations with charger details and navigation options.

UCharge app map showing EV charging station locations with charger details and navigation options.

UCharge Powered by UNIPET - UCharge app map interface showing real-time locations and availability of electric vehicle charging stations

UCharge app map interface showing real-time locations and availability of electric vehicle charging stations

UCharge Powered by UNIPET - UCharge app screen displaying real-time electric vehicle charging status energy usage and costs

UCharge app screen displaying real-time electric vehicle charging status energy usage and costs

UCharge Powered by UNIPET - Screen showing EV charging station search filters for connector types and power levels in the UCharge app

Screen showing EV charging station search filters for connector types and power levels in the UCharge app

Description

Download the most accurate and reliable EV charging station app today! U-Charge is the region’s leading EV charging network, with the most innovative technology that simplifies your charging experience. The U-Charge app uses location-based services that allow drivers to locate the nearest U-Charge charging easily station, check availability, reserve access, and securely pay for services - all within the app. With the U-Charge app, you can: • See which stations are available in real time. • Select locations based on charger types (Level 1, 2, or DC Fast Chargers) • Reserve a charger and start charging from your phone. • Get real-time updates about your charging session. • Make secure payments using your digital wallet, credit, debit cards, etc. • View your charging transaction history, trends, and miles accumulated. • Get helpful tips and advice about your EV. • Rate and give reviews about charging stations and much more! Download the U-Charge app and join the region’s largest and most reliable EV community today!

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.