AFAQY AVL
AFAQY AVL
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of AFAQY AVL
Download on App Store

AFAQY AVL

Optimize your business operations with real-time location insights and advanced asset protection. Monitor your fleet's activity, reduce operational costs, and secure your mobile inventory from your smartphone.

Key Figures

Downloads

11K+

User Rating

3.5/5

Total Ratings

0

Publisher

AFAQY

Category

Navigation

Locales

2

Latest Version

3.8

Size

125.4 MB

First Released

Sep 9, 2019
Features

Maximize Your Fleet's Potential

AFAQY AVL provides the real-time data and security tools you need to streamline operations, protect your investments, and deliver superior customer service.

Real-Time Fleet Visibility

Monitor your entire fleet's location and activity on a single map to eliminate guesswork and provide accurate ETAs.

Advanced Asset Protection

Protect your vehicles from theft with instant alerts and precise recovery tracking, ensuring your high-value assets are always safe.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

AFAQY AVL - AFAQY AVL mobile app splash screen for fleet GPS tracking

AFAQY AVL mobile app splash screen for fleet GPS tracking

AFAQY AVL - AFAQY AVL mobile app fleet dashboard showing total active units and engine status summary

AFAQY AVL mobile app fleet dashboard showing total active units and engine status summary

AFAQY AVL - AFAQY AVL app displaying real-time fleet unit locations on a map.

AFAQY AVL app displaying real-time fleet unit locations on a map.

AFAQY AVL - AFAQY AVL app interface showing a vehicle's real-time location on a map with address and speed details.

AFAQY AVL app interface showing a vehicle's real-time location on a map with address and speed details.

AFAQY AVL - A mobile app screen showing vehicle tracking history with route map and driving stats.

A mobile app screen showing vehicle tracking history with route map and driving stats.

AFAQY AVL - Live vehicle tracking screen in the AFAQY AVL app showing map location and fleet unit details

Live vehicle tracking screen in the AFAQY AVL app showing map location and fleet unit details

AFAQY AVL - A mobile app screen displaying live notifications and overspeed alerts for fleet vehicle tracking.

A mobile app screen displaying live notifications and overspeed alerts for fleet vehicle tracking.

AFAQY AVL - Report generation screen in the AFAQY AVL app showing options for PDF and Excel exports.

Report generation screen in the AFAQY AVL app showing options for PDF and Excel exports.

AFAQY AVL - AFAQY AVL app settings interface showing fleet management configuration options

AFAQY AVL app settings interface showing fleet management configuration options

AFAQY AVL - AFAQY AVL app interface showing remote vehicle control buttons and live location map

AFAQY AVL app interface showing remote vehicle control buttons and live location map

Description

AFAQY AVL, Track Your Truck offers an efficient, effective vehicle tracking system for managing your business fleet. Vehicle Tracking Devices deliver real-time information on the location, activity and mobile inventory of your vehicles to improve business performance and customer service. Track Your Truck vehicle tracking devices also provide valuable protection in the event of vehicle theft and recovery. Note: Continued use of GPS running in the background can decrease battery life.

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.