This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.
Chinese Writer by trainchinese
Ditch the flashcards for an addictive arcade experience. Master stroke order for over 5,600 characters with HSK-aligned levels designed for students and high-achievers.
Downloads
62K+User Rating
Total Ratings
1K+Publisher
Category
EducationLocales
4Latest Version
6.3.6Size
201.0 MBFirst Released
Apr 21, 2011Master Chinese Characters Through Play
Stop memorizing and start mastering. Our edutainment platform combines arcade-style mechanics with academic rigor to turn the world's most challenging script into an addictive daily habit.
Active Writing Mastery
Bypass performance anxiety with reflex-based drawing. Trace falling characters in real-time to build muscle memory and learn correct stroke order through intuitive gameplay.
HSK-Aligned Progression
Follow the official global standard for Mandarin proficiency. Access 5,600+ Simplified and Traditional characters organized by difficulty levels, from beginner to HSK 6 expert.
More Like This
Top-ranked apps in the same category
Duolingo - Language Lessons
Duolingo, Inc
Speak & Learn English: Learna
DEEP FLOW SOFTWARE SERVICES - FZCO
驾考宝典-科一科四驾驶证考试驾考通
Wuhan Jiakaobaodian Information Service Co., Ltd.
Toca Boca World
Toca Boca AB
Google Classroom
Google LLC
作业帮-中小学家长作业检查和辅导工具
Guangzhou Polar Future Culture Technology Co., Ltd
学信网
Student Information Consultation Service Co., Ltd.
Gauth: AI Study Companion
GAUTHTECH PTE. LTD.
ArtWorkout: Learn How to Draw
Aleksandr Ulitin
This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.