旦旦守护 - 情侣实时定位&独居安全报备
旦旦守护 - 情侣实时定位&独居安全报备
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of 旦旦守护 - 情侣实时定位&独居安全报备
Download on App Store

旦旦守护 - 情侣实时定位&独居安全报备

Stay connected with high-precision GPS tracking, 365-day travel history, and automatic safety alerts. The ultimate peace of mind for long-distance relationships and independent living.

Key Figures

Downloads

0

User Rating

4.6/5

Total Ratings

0

Publisher

Xiamen Kuaile Xiaotian Intelligence Technology Co., Ltd.

Category

Navigation

Locales

1

Latest Version

1.7.5

Size

78.0 MB

First Released

Apr 9, 2024
Features

Your World, Safely Connected

From long-distance relationships to late-night commutes, Dandan Guard provides high-precision tools to stay in sync with the people who matter most, without the battery drain.

Couple’s Live Connection

Share more than just a map location. View real-time battery levels, signal strength, and movement status so you always feel close, even when miles apart.

Smart Safety Geofencing

Eliminate 'text me when you're home' anxiety. Set custom zones for home or work and get instant notifications when your loved ones arrive or leave safely.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

旦旦守护 - 情侣实时定位&独居安全报备 - Real-time location sharing interface of Dandan Guard app showing a couple on a map with battery status and address details

Real-time location sharing interface of Dandan Guard app showing a couple on a map with battery status and address details

旦旦守护 - 情侣实时定位&独居安全报备 - Mobile interface of Dandan Guard showing 365-day location history tracking on a map with detailed movement paths and stay duration.

Mobile interface of Dandan Guard showing 365-day location history tracking on a map with detailed movement paths and stay duration.

旦旦守护 - 情侣实时定位&独居安全报备 - Mobile phone showing real-time notifications for location arrival departure and battery status on the Dandan Guard app

Mobile phone showing real-time notifications for location arrival departure and battery status on the Dandan Guard app

旦旦守护 - 情侣实时定位&独居安全报备 - Dandan Guard app screenshot showing battery status and friend location update notifications for silent personal safety protection.

Dandan Guard app screenshot showing battery status and friend location update notifications for silent personal safety protection.

Description

旦旦守护提供高精度的手机实时定位追踪和轨迹记录服务,已为超百万用户解决异地牵挂、家庭守护、独居安全等问题,让你随时掌握亲友动态,安心又放心。 软件主要功能亮点: 1.高精度定位:精确到门牌号,后台持续运行,低耗电不发烫,定位不掉线、不漂移。 2.实时位置共享:随时查找亲友实时位置、去过哪里、停留多久、出行方式(步行/骑行/乘车等)。 3.历史足迹记录:全自动保存近365天足迹,支持按日查询,清晰查看移动轨迹。 4.围栏提醒:设置家、公司、学校、等地点,到达或离开自动报备通知,支持微信同步提醒报平安。 5.设备状态查看:实时显示电量、Wi-Fi、信号强度、手机型号,出门在外也能全面掌握亲友状态。 6.永久免费定位2位好友:基础功能不收费,无广告无套路,真正可靠好用的手机定位神器。 适用场景: 1.情侣定位器:异地恋也能“我和你”实时Bind, 同步心动日常甜蜜轨迹,情侣地图永不断线。 2.家人守护:就像“小天才电话手表”一样,在这里阳光守护爱人、孩子、老人的安全。 3.独居/夜归者:实时共享位置,独居报平安,安全守护更及时。 4.留学生/外出务工者:跨省跨国无障碍查找,亲密守护更甜蜜。 【声明】信息共享或权限共享等服务需经他人授权或双方同意方可使用。 【旦旦守护】是对所爱之人的一份承诺,也是你给自己的安心选择。 立即下载,在这里定位,让『旦旦守护』成为你值得信赖的专属守护助手!

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.