Stop guessing and start growing. Experience personalized, non-repeatable gym routines optimized by AI, track every set on your Apple Watch, and visualize your progress with professional-grade analytics.
Publisher
Category
Health & FitnessDownloads
144K+User Rating
Total Ratings
600Locales
21Discover the interface used by 144K+ users.
The tools that make this app stand out, trusted by 144K+ users.
Eliminate routine fatigue with non-repeatable, balanced workouts generated by our smart algorithm. Swap exercises on the fly and stay in control of your gains.
Visualize your performance through detailed statistical graphs and KPI tracking. Seamlessly sync with Apple Watch and the Health app to keep your health data unified.
Master your technique with over 300 high-definition instructions from professional coaches. Perfect your form and reduce injury risk with science-based training.
Everything you need to know about Fitonist Gym Workout Planner.
Description
Latest Version
1.136
Size
165.7 MB
First Released
Oct 30, 2022
Apps with similar features and user experience
FITNESS ONLINE MChJ
Leap Health Fitness Limited
Fitbod Inc.
Beijing Calorie Technology Co., Ltd.
Lindberg Development AS
Ladder Technologies, Inc.
3APPS SOLUTIONS AND ADVISORY LTDA
Leap Health Fitness Limited
ABISHKKING LIMITED.
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute