iPractice Verbs
iPractice Verbs
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of iPractice Verbs
Download on App Store

iPractice Verbs

Designed by certified Speech-Language Pathologists to help children master 158+ verbs across three tenses and levels. Turn therapy into play with data-driven reporting, engaging games, and rewarding progress for every student.

Key Figures

Downloads

0

User Rating

3.4/5

Total Ratings

0

Publisher

Smarty Ears, LLC

Category

Education

Locales

3

Latest Version

7.0

Size

96.1 MB

First Released

Mar 18, 2010
Features

Clinical Precision Meets Playful Learning

Designed by a certified Speech-Language Pathologist, our comprehensive system helps children master 158+ verbs through a structured, data-driven approach that feels like play.

Tailored 3x3 Learning System

Differentiate instruction effortlessly by toggling between three tenses and three levels of complexity, from single words to full sentences.

Automated Progress Reports

Eliminate manual paperwork with detailed data tracking for multiple profiles, perfect for IEP documentation and sharing growth with parents.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

iPractice Verbs - Home screen of iPractice Verbs app showing animated characters and menu buttons for starting practice and viewing reports.

Home screen of iPractice Verbs app showing animated characters and menu buttons for starting practice and viewing reports.

iPractice Verbs - Activity selection menu in iPractice Verbs showing options for FlashCards and Find it game modes

Activity selection menu in iPractice Verbs showing options for FlashCards and Find it game modes

iPractice Verbs - A menu in the iPractice Verbs app allowing users to select or deselect specific regular and irregular verbs for a practice session.

A menu in the iPractice Verbs app allowing users to select or deselect specific regular and irregular verbs for a practice session.

iPractice Verbs - iPractice Verbs app interface showing a sentence level verb exercise for the word find

iPractice Verbs app interface showing a sentence level verb exercise for the word find

iPractice Verbs - The iPractice Verbs app interface showing a verb lesson for the word applaud at the sentence level.

The iPractice Verbs app interface showing a verb lesson for the word applaud at the sentence level.

iPractice Verbs - A detailed student performance report in iPractice Verbs showing session data and grammar metrics

A detailed student performance report in iPractice Verbs showing session data and grammar metrics

iPractice Verbs - A settings menu in the iPractice Verbs app where users can select verb tenses and practice levels like Word, Phrase, or Sentence.

A settings menu in the iPractice Verbs app where users can select verb tenses and practice levels like Word, Phrase, or Sentence.

iPractice Verbs - iPractice Verbs app screen showing a multiple choice game for practicing sentence level verbs.

iPractice Verbs app screen showing a multiple choice game for practicing sentence level verbs.

iPractice Verbs - iPractice Verbs app game screen with four pictures and the sentence She is stitching it

iPractice Verbs app game screen with four pictures and the sentence She is stitching it

iPractice Verbs - The Report Center screen in iPractice Verbs showing options to select a student's mastery level for generating a progress report.

The Report Center screen in iPractice Verbs showing options to select a student's mastery level for generating a progress report.

Description

Master English verbs with iPractice Verbs, the fun and engaging app designed by a certified Speech-Language Pathologist. Perfect for children with language delays, students learning English (ESL), or any child building foundational grammar, our app turns practice into play. Unlock your child's potential with a complete, structured system that’s both fun for them and powerful for you. A COMPLETE LEARNING SYSTEM iPractice Verbs targets 158+ essential regular and irregular verbs. Our unique 3x3 system allows you to create a perfectly tailored lesson every time. Master 3 Tenses: Present Tense Present Progressive (e.g., "is running") Past Tense Practice 3 Levels: Word Level (e.g., "Run") Phrase Level (e.g., "running fast") Sentence Level (e.g., "She ran fast yesterday.") TWO FUN & ENGAGING ACTIVITIES FLASHCARDS Introduce and practice verbs with high-quality images and audio. Use the Voice Recording feature to let students hear, repeat, and record their own voice to perfect pronunciation! FIND IT! GAME A fun, multiple-choice game to test understanding. Our "Smart Assist" feature guides students to the correct answer when they make a mistake, building confidence and ensuring learning. POWERFUL TOOLS FOR PARENTS & THERAPISTS iPractice Verbs is more than just a game—it's a professional tool built for results. DETAILED DATA TRACKING: Automatically track every session. Monitor accuracy, duration, and verbs practiced for one or multiple students. MULTI-PLAYER SUPPORT: Easily manage and switch between multiple student profiles. MOTIVATIONAL REWARDS: Keep kids engaged with a fun, built-in reward system where they can earn and collect cards. PRINTABLE CERTIFICATES: Reward success and celebrate mastery with shareable Certificates of Mastery. HOMEWORK READY: Generate and print homework sheets directly from the app. KEY FEATURES AT A GLANCE: 158+ regular and irregular verbs Practice Past, Present, and Present Progressive tenses Learn at Word, Phrase, and Sentence levels Voice Recording feature for pronunciation practice Engaging "Find It" game with Smart Assist Fun reward system with collectible cards Detailed, professional data tracking and reporting Multi-player profiles for therapists and families Printable homework and certificates High-quality images and audio Aligned with state educational standards A TRUSTED TOOL FROM SMARTY EARS Designed by a licensed and certified Speech-Language Pathologist, iPractice Verbs is a trusted tool for helping children achieve their language goals. Download iPractice Verbs today and watch language skills grow!

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.