Publisher
Category
LifestyleDownloads
100User Rating
Total Ratings
0Locales
1Discover the interface used by 100 users.
The tools that make this app stand out, trusted by 100 users.
Track Japa, Mangal Aarti, and Seva with intuitive logs. Visualize your consistency through charts that turn spiritual habits into measurable growth.
Stay connected to your roots by sharing your progress and realizations directly with your Guru or mentors, bridging the gap between ancient tradition and modern life.
Log your daily reading and listening in one centralized 'Life OS.' Capture every realization to build a searchable library of your personal spiritual evolution.
Everything you need to know about Krishna Smriti.
Description
Latest Version
1.0.10+23
Size
76.1 MB
First Released
Aug 13, 2025
Top-ranked apps in the same category
Pinterest, Inc.
Alipay (Hangzhou) Technology Co., Ltd.
Hanhai Information Technology (Shanghai) Co.Ltd
Sankuai Technology Co., Ltd.
TIKTOK PTE. LTD.
Beijing Xiaomi Co., Ltd
Tinder LLC
Samsung Electronics Co., Ltd.
GLOBAL TECHNOLOGY - TELECOMMUNICATIONS CORPORATION
App information, icons, screenshots, and descriptions displayed on this page are sourced from the Apple App Store and are the property of their respective developers. Download estimates and rankings are based on MWM's proprietary models and may not reflect actual figures. This page is provided for informational and analytical purposes only.
Believe this page infringes your intellectual property? File a dispute