OnStation - Digital Stationing
OnStation - Digital Stationing
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of OnStation - Digital Stationing
Download on App Store

OnStation - Digital Stationing

Empower your field crews with instant GPS stationing, alignment, and offset details. Capture photos, e-tickets, and core tests in one collaborative dashboard to ensure reliable project data from bid to close.

Key Figures

Downloads

0

User Rating

4.8/5

Total Ratings

0

Publisher

PROJiTECH LLC

Category

Reference

Locales

1

Latest Version

4.1.0

Size

179.5 MB

First Released

Jul 4, 2018
Features

Master the Job Site with Digital Precision

OnStation puts everything from location data to project communication in the palm of your hand, ensuring your heavy civil projects stay on track and under budget.

Instant Stationing & Offsets

Get immediate station and alignment details via GPS. Stop searching for physical markers and start working with real-time location accuracy.

Unified Field Records

Consolidate e-tickets, core tests, and site photos in one location. Create a digital paper trail that protects your firm and simplifies DOT inspections.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

OnStation - Digital Stationing - OnStation mobile app showing digital stationing coordinates on a highway construction map

OnStation mobile app showing digital stationing coordinates on a highway construction map

OnStation - Digital Stationing - Interface of the OnStation app showing a construction photo stamped with station, date, and GPS location data.

Interface of the OnStation app showing a construction photo stamped with station, date, and GPS location data.

OnStation - Digital Stationing - OnStation app interface showing distance measurement on a satellite map

OnStation app interface showing distance measurement on a satellite map

OnStation - Digital Stationing - OnStation mobile app displaying a digital field moisture test form for construction projects

OnStation mobile app displaying a digital field moisture test form for construction projects

OnStation - Digital Stationing - Mobile interface of OnStation app displaying construction design layers overlaid on a satellite map for digital stationing.

Mobile interface of OnStation app displaying construction design layers overlaid on a satellite map for digital stationing.

OnStation - Digital Stationing - OnStation app interface showing the Flag and Chat feature with a project conversation and shared photo of a construction barricade

OnStation app interface showing the Flag and Chat feature with a project conversation and shared photo of a construction barricade

OnStation - Digital Stationing - OnStation app interface showing the Digital Daily Diary feature with options to sync project data to HeavyJob.

OnStation app interface showing the Digital Daily Diary feature with options to sync project data to HeavyJob.

OnStation - Digital Stationing - Viewing digital construction project plans on a smartphone using the OnStation app

Viewing digital construction project plans on a smartphone using the OnStation app

Description

The Leading Digital Stationing Platform. A collaborative digital stationing platform that provides location-based project records from bid to close. Our mobile app instantly provides station, alignment, and offset details while on a project site. Projects come fully configured making rollout simple, and our stationing experts provide a wide variety of support to ensure a smooth onboarding experience. Join us in creating a better future where reliable project data (pictures, chats, e-tickets, core tests, and much more) is captured on-site and is visible within your organization’s dashboard presented within OnStation’s user portal. Never be lost or look for project records again.

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.