TypeCode
TypeCode
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of TypeCode
Download on App Store

TypeCode

The ultimate drag-and-drop playground for the next generation of creators. Build games, design animations, and master coding logic—no complex syntax required.

Key Figures

Downloads

21K+

User Rating

3.5/5

Total Ratings

400

Publisher

俊杰 卢

Category

Education

Locales

2

Latest Version

2.2

Size

170.4 MB

First Released

Nov 25, 2024
Features

Turn Your Ideas Into Reality

TypeCode makes coding accessible for everyone. Skip the complex syntax and start building apps, games, and animations with our intuitive visual platform.

Visual Drag-and-Drop Coding

Build complex logic without typing a single line of code. Our intuitive block system makes programming feel like solving a fun puzzle.

Infinite Creative Freedom

From interactive animations to fully functional mini-games, use our versatile tools to bring your unique vision to life on any screen.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

TypeCode - A visual programming interface in TypeCode featuring colorful drag-and-drop coding blocks and a cat character on a black stage.

A visual programming interface in TypeCode featuring colorful drag-and-drop coding blocks and a cat character on a black stage.

TypeCode - Gallery of visual programming projects in the TypeCode app

Gallery of visual programming projects in the TypeCode app

TypeCode - TypeCode app project dashboard showing saved visual programming projects with blue block icons

TypeCode app project dashboard showing saved visual programming projects with blue block icons

TypeCode - A menu screen within the TypeCode app showing a list of programming lessons and curriculum topics

A menu screen within the TypeCode app showing a list of programming lessons and curriculum topics

Description

《TypeCode》VIP服务概览 自动续费订阅 周期与费用:每月自动续费的VIP会员资格,订阅费用为每月6元。 服务协议:图形编程自动续费服务条款 一次性购买选项 1个月VIP:8元 3个月VIP:18元 1年VIP:68元 永久VIP:58元 支付与管理 支付方式:通过用户的iTunes账户进行支付,在用户确认购买后立即扣款。 取消续订:若不希望继续订阅,请提前至少24小时在iTunes/Apple ID设置中手动关闭自动续订功能。 续订说明:苹果iTunes会在当前订阅周期结束前24小时内自动扣费,确保订阅无缝延续。 重要链接 《TypeCode》VIP服务条款: https://aihumei.com/codeapp.html 苹果iTunes服务条款: https://www.apple.com/legal/internet-services/itunes/dev/minterms/ 隐私政策: https://aihumei.com/codehtml/privacypolicy.html 联系我们: https://www.aihumei.com/luke/contact.html《TypeCode》致力于提供一个简单易用、创意无限的学习平台。无论是初学者,无论您是编程新手还是有一定基础的开发者,都可以在这里通过直观的拖拽操作,轻松创建属于自己的应用和动画。我们支持多种平台,并拥有一个充满活力的全球社区,为您提供持续的支持和灵感。无需编写复杂代码,即可快速实现您的创意构想,享受高效便捷的开发乐趣。 立即体验TypeCode,让您的想法迅速成真!如果您有任何问题或建议,欢迎随时联系我们。

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.