心动轨迹-情侣定位软件密友位置共享
心动轨迹-情侣定位软件密友位置共享
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of 心动轨迹-情侣定位软件密友位置共享
Download on App Store

心动轨迹-情侣定位软件密友位置共享

The ultimate companion for couples and best friends. Share real-time locations, get automatic arrival alerts, and stay protected with built-in safety tools designed for your inner circle.

Key Figures

Downloads

0

User Rating

4.5/5

Total Ratings

0

Publisher

Mianyang Jianyixuan Technology Co., Ltd.

Category

Social Networking

Locales

2

Latest Version

1.3.6

Size

71.9 MB

First Released

Jun 13, 2023
Features

Always Together, Always Safe

Whether you are miles apart or just across town, Heartbeat Track synchronizes your lives with intuitive location sharing and proactive safety tools designed for modern relationships.

Live Connection & Trajectory

Share your real-time location and view full journey histories. Automatically detect if your partner is walking, cycling, or driving to stay in sync throughout the day.

Automated Care Alerts

Eliminate the 'text me when you get home' anxiety. Get instant notifications for arrivals, departures, and even low-battery alerts when their phone hits 20%.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

心动轨迹-情侣定位软件密友位置共享 - Heartbeat Track app interface displaying real time location sharing for couples on a map

Heartbeat Track app interface displaying real time location sharing for couples on a map

心动轨迹-情侣定位软件密友位置共享 - Interface of the Heartbeat Track app showing a real-time location map and a detailed 30-day movement history timeline for couples.

Interface of the Heartbeat Track app showing a real-time location map and a detailed 30-day movement history timeline for couples.

心动轨迹-情侣定位软件密友位置共享 - iPhone lock screen displaying arrival and departure notifications from the Heartbeat Track couple location app

iPhone lock screen displaying arrival and departure notifications from the Heartbeat Track couple location app

心动轨迹-情侣定位软件密友位置共享 - Interface of the Heartbeat Track app showing a real-time location map with a notification alert for a friend's low phone battery.

Interface of the Heartbeat Track app showing a real-time location map with a notification alert for a friend's low phone battery.

心动轨迹-情侣定位软件密友位置共享 - Mobile app interface of Heartbeat Track showing a relationship anniversary counter displaying 975 days with a reminder setting.

Mobile app interface of Heartbeat Track showing a relationship anniversary counter displaying 975 days with a reminder setting.

心动轨迹-情侣定位软件密友位置共享 - A mobile app screen showing a personal mood diary with dated entries, a photo, and heart emojis in a soft pastel aesthetic.

A mobile app screen showing a personal mood diary with dated entries, a photo, and heart emojis in a soft pastel aesthetic.

Description

全自动记录位置、自动报备、查找实时位置轨迹,专为异地恋、情侣、密友设计的。 --情侣必备,增强信任--
 【特色功能】
 - 实时定位位置共享:实时查询Ta的行踪,时刻守护; 
- 全天轨迹记录查询:行程轨迹路线时间轴,并且能识别交通工具(走路,骑行,乘车); - 出门提醒:到家提醒、到公司提醒
; - 自动报备:当关心的人手机电量低于20%时,会立刻收到消息; 
- 心情日记:根据心情记录每日所见所闻; 
- 模拟来电,模拟聊天:想走的时候就有借口了; 
- 防狼警报:防狼神器,遇到危险,立马开启报警器; 
- 恋爱纪念日:每次开屏展示相恋时间,永不忘记。 
【注意事项】 - 定位功能免责声明:定位功能需要双方下载,安装,同意方可使用。 
- 恶意账号免责声明:禁止未经对方同意及授权的情况下使用,仅可用于家庭/亲友/熟人/朋友间使用,如发现有违规行为,一经发现立即冻结账号,相关会员费用不予退还,请知晓; 
- 电池使用免责声明:定位和轨迹服务会持续使用GPS定位服务,相比其他操作会消耗更多的电量,并影响电池续航时间; 
- 软件使用建议:让所有好友都把对心动轨迹的定位权限设置为始终允许,这样我们才可以更精准更的记录您的轨迹并帮你把轨迹分享给你关心的人,他们才可以随时知道您的精确位置 

【连续订阅会员说明】 
--无忧周会员说明
 -订阅周期:7天
 -订阅价格:58元/周 

--无忧月会员说明
 -订阅周期:1个月 
-订阅价格:98元/月


 --无忧年会员说明
 -订阅周期:1年
 -订阅价格:298元/年

 --其他规则
 -付款: 用户通过 iTunes 账户扣款, 用户确认购买后即付款; 
-续订: 用户 iTunes 账户在到期前的二十四小时内扣费, 增加相应的订阅周期; 
-取消续订: 如需取消续订, 进入"iTunes Store 与 App Store" —> 点击 "App ID", 进入 "账户设置" 页面, 点击 "订阅", 选择取消订阅即可; 
-付费会员服务协议:https://kpk.myjyx.cn/paidmember.html
 -续费协议:https://kpk.myjyx.cn/renew.html



 【服务条款】 
用户协议:https://kpk.myjyx.cn/userprivacy.html
 隐私条款:https://kpk.myjyx.cn/privacyprolicy.html

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.