This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.
Bump - hang with friends IRL
The real-time map for your squad from the creators of Zenly. See where the vibe is, share what you’re listening to, and shake phones to link up.
Downloads
7M+User Rating
Total Ratings
98K+Publisher
Category
Social NetworkingLocales
31Latest Version
2.48.0Size
273.0 MBFirst Released
Dec 19, 2023Never Miss the Vibe
Real-time location, live music sync, and effortless meetups. Bump is the ultimate map for you and your inner circle to stay connected IRL.
See Where the Party's At
Track your friends in real-time. Check their battery level, movement speed, and exactly how long they've been at the spot before you head out.
Share the Soundtrack
Instantly hear what your friends are vibing to on Spotify or Apple Music. Save their tracks to your library without ever leaving the map.
Frequently Asked Questions
Everything you need to know about Bump - hang with friends IRL
What is Bump - hang with friends IRL?
Bump is a location-sharing app that allows users to create a personal map of friends and places. It offers precise, real-time, and battery-friendly location sharing to connect with people in real life.
Is the Bump app free to download and use?
Yes, the Bump app is free to download and use. All its features, including location sharing, chat, and place discovery, are available to users without any cost.
How does Bump allow me to see what my friends are doing?
Bump allows users to see friends' live location, battery level, speed, and how long they have been somewhere. It also displays what music friends are currently listening to on Apple Music or Spotify.
Can I share my location with friends using Bump?
Yes, Bump enables precise, real-time, and battery-friendly location sharing with your chosen friends. It helps you keep track of their whereabouts and status on a personal map.
What is the "Bump!" feature in the Bump app?
The "Bump!" feature allows users to shake their phones to notify friends that they are hanging out. This provides a quick and interactive way to signal availability for meetups.
Does Bump offer a chat function?
Yes, Bump includes a chat feature. Users can send text, stickers, images, videos, and GIFs in 1:1 conversations or group chats directly from the map.
How does Bump help me discover places?
Bump automatically detects places you visit to build your personal map. Users can search for places, see if friends have visited, get directions, or save them for future reference.
What is the Scratch Map feature in Bump?
The Scratch Map feature automatically builds a record of everywhere you have been while carrying your phone. Users can compete with friends to uncover their local area.
Can Bump help me with navigation to friends or places?
Yes, Bump provides navigation support. Users can get routes using Apple Maps, call an Uber, and share their live ETA to friends' lockscreens to meet up easily.
Does Bump support non-iPhone devices?
Yes, Bump works for friends who do not have iPhones. The app ensures connectivity and location sharing capabilities are available across different mobile platforms.
Does Bump have home screen widgets?
Yes, Bump allows users to add location widgets to their home screen. These widgets provide a quick view of what friends are currently doing or where they are.
Can I turn off my location sharing on Bump?
Yes, Bump offers a "ghost mode" feature. This allows users to temporarily take time off the map and control their location visibility from friends for privacy.
Can I see university-specific information on Bump?
Yes, users can join their school on Bump to see a directory of everyone there, claim their frat or sorority, and see what music is trending on campus.
More Like This
Apps with similar features and user experience
Blink — Friends circle
Blinkmap Limited
Beer Buddy - Friends Alerts
Buddy Network GmbH
Beer With Me
Beer With Me AB
whoo - Meet Your Friends
LINQ, K.K.
Locate & Track Phone By Number
Blender Soft Ltd
Findus-安心守护日常自动报备
Chongqing Wanyijia Technology Co., Ltd.
Niantic Campfire
Niantic, Inc.
Tracker - Share My Location
Andy Brailo
eta: Share ETAs & Journeys
ONIN LTD.
This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.