成长兔-专注英语启蒙教育
成长兔-专注英语启蒙教育
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of 成长兔-专注英语启蒙教育
Download on App Store

成长兔-专注英语启蒙教育

专为华人家庭打造,遵循“听说读写练”科学逻辑。结合真人外教互动、情景式教学与海量原版绘本,让孩子在趣味互动中轻松掌握地道英语,顺利衔接小学课程。

Key Figures

Downloads

100

User Rating

4.8/5

Total Ratings

0

Publisher

Beijing QiMeng Education Technology Co., Ltd.

Category

Education

Locales

1

Latest Version

2.9.15

Size

133.6 MB

First Released

Dec 13, 2020
Features

Empowering the Next Generation of Bilingual Leaders

Bridge the gap between heritage and home with a systematic, gamified English learning platform designed for kids age 6+ to thrive in the US education system.

Scientific Learning Path

Our proven 'Listen-Speak-Read-Write-Practice' methodology ensures your child builds deep fluency, moving beyond memorization to true linguistic mastery.

Interactive Native Dialogue

Engage with real-world scenarios and AI-powered interactions that encourage active output, helping kids find their voice with native-level pronunciation.

FAQ

Frequently Asked Questions

Everything you need to know about 成长兔-专注英语启蒙教育

What is 成长兔 (Growth Rabbit)?

成长兔 (Growth Rabbit) is a smart English co-learning system designed for children aged 6 and above and their parents. It focuses on English enlightenment education with systematic, engaging courses.

What age group does 成长兔 (Growth Rabbit) target?

Yes, 成长兔 (Growth Rabbit) is designed for children aged 6 and above. The app provides English enlightenment education specifically tailored for this age group and their parents.

Does 成长兔 (Growth Rabbit) use gamified learning?

Yes, 成长兔 (Growth Rabbit) integrates gamification, situational learning, and task-based approaches to present its courses. This core method makes learning engaging and motivating for children.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

成长兔-专注英语启蒙教育 - Growth Rabbit app interface displaying English learning curriculum and interactive lessons for young children.

Growth Rabbit app interface displaying English learning curriculum and interactive lessons for young children.

成长兔-专注英语启蒙教育 - Growth Rabbit app interface showing nursery rhyme animations, interactive classroom, and pronunciation practice with a teacher.

Growth Rabbit app interface showing nursery rhyme animations, interactive classroom, and pronunciation practice with a teacher.

成长兔-专注英语启蒙教育 - English learning progress report in the Growth Rabbit app showing study goals and achievement medals.

English learning progress report in the Growth Rabbit app showing study goals and achievement medals.

成长兔-专注英语启蒙教育 - Growth Rabbit app screen showing four educational modules for listening speaking phonics and reading

Growth Rabbit app screen showing four educational modules for listening speaking phonics and reading

成长兔-专注英语启蒙教育 - Growth Rabbit app interface displaying level 1 english lessons with animal themes including a panda monkey and pig

Growth Rabbit app interface displaying level 1 english lessons with animal themes including a panda monkey and pig

成长兔-专注英语启蒙教育 - Interactive animal vocabulary matching game in the Growth Rabbit English learning app.

Interactive animal vocabulary matching game in the Growth Rabbit English learning app.

成长兔-专注英语启蒙教育 - A screen from the Growth Rabbit app showing three learning categories: Vocabulary, Children's songs, and Stories.

A screen from the Growth Rabbit app showing three learning categories: Vocabulary, Children's songs, and Stories.

成长兔-专注英语启蒙教育 - Growth Rabbit app dashboard showing completed English learning activities for children

Growth Rabbit app dashboard showing completed English learning activities for children

成长兔-专注英语启蒙教育 - Interface of Growth Rabbit app showing a collection of English educational videos for kids including songs and teacher interactions

Interface of Growth Rabbit app showing a collection of English educational videos for kids including songs and teacher interactions

Description

为6岁以上儿童和家长制定的智能英语伴学系统 以学习兴趣为前提,过程结合密集的练习频率、系统学习的课程体系、丰富的语言学习资源,以输出、检测和鼓励为结尾,用科学合理的教学逻辑提供给孩子和家长一款优质的启蒙英语教育产品。 【学习兴趣】游戏化、情景式、任务制为核心,不沉迷、不困难、不断激励的形式将课程呈现给用户 【课中学习】互动练习、及时反馈、先听后说,大量的有效互动贯穿课程 【课后检测】以输出为目标,进行多次检测及检测后的及时鼓励,让孩子学习过程中不沉浸、更愿意、更主动的学 转变市场常规教学方式,从“读-背-写-听”到“听-说-读-写-练”,提供科学的母语启蒙方式 课程内容覆盖年龄和语言能力两个维度,分为英语语言吸收期、英语词汇积累期、英语口语表达期、英语阅读兴趣期,为6岁+年龄段的孩子和家长提供双语故事、精美儿歌、体系课、原版绘本等多个产品内容。更是涵盖了真人外教互动对话、情景式互动教学、大量听力互动练习、海量经典原版绘本、趣味配音互动,帮助孩子顺利过渡到小学课程,帮助家长轻松完成英语启蒙教育。 精彩多多,价格不贵

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.