EcuaGPS
EcuaGPS
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of EcuaGPS
Download on App Store

EcuaGPS

Protect what matters most with real-time tracking, instant security alerts, and GeoFence notifications. Stay connected to your loved ones and keep your car secure with the companion you can trust.

Key Figures

Downloads

0

User Rating

5.0/5

Total Ratings

0

Publisher

Diego Ramon

Category

Navigation

Locales

2

Latest Version

2.0.14

Size

64.3 MB

First Released

Jul 28, 2023
Features

Total Peace of Mind for Your Family and Assets

EcuaGPS provides the security you need to protect your vehicles and loved ones with real-time monitoring and instant smart notifications.

Real-Time GPS Tracking

Instantly locate your vehicle or family members on a live map, ensuring they are safe and on the right track at all times.

Instant Security Alerts

Stay informed with immediate push notifications for speeding, low battery, or when a vehicle enters or leaves your custom safe zones.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

EcuaGPS - EcuaGPS mobile app screen displaying a real-time vehicle ignition alert notification and the brand logo for total security.

EcuaGPS mobile app screen displaying a real-time vehicle ignition alert notification and the brand logo for total security.

EcuaGPS - EcuaGPS mobile app interface displaying a list of tracked vehicles with real-time status updates

EcuaGPS mobile app interface displaying a list of tracked vehicles with real-time status updates

EcuaGPS - EcuaGPS app interface showing live vehicle tracking and status for a Ford Ranger

EcuaGPS app interface showing live vehicle tracking and status for a Ford Ranger

EcuaGPS - EcuaGPS mobile app screenshot showing remote vehicle door lock and unlock commands

EcuaGPS mobile app screenshot showing remote vehicle door lock and unlock commands

EcuaGPS - EcuaGPS app interface displaying vehicle diagnostics including fuel consumption and engine hours for a Ford Ranger

EcuaGPS app interface displaying vehicle diagnostics including fuel consumption and engine hours for a Ford Ranger

EcuaGPS - Map interface of the EcuaGPS app showing real-time locations of tracked vehicles.

Map interface of the EcuaGPS app showing real-time locations of tracked vehicles.

EcuaGPS - EcuaGPS app interface showing custom vehicle commands for remote locking and speed limits

EcuaGPS app interface showing custom vehicle commands for remote locking and speed limits

EcuaGPS - EcuaGPS app interface showing a vehicle's route history on a map with real-time speed and timestamp data

EcuaGPS app interface showing a vehicle's route history on a map with real-time speed and timestamp data

EcuaGPS - Interface of the EcuaGPS app showing how to create a geofence around a home on a map

Interface of the EcuaGPS app showing how to create a geofence around a home on a map

EcuaGPS - EcuaGPS app showing a vehicle ignition notification and location on a map.

EcuaGPS app showing a vehicle ignition notification and location on a map.

Description

Con EcuaGPS, conduce con tranquilidad. Protege a tus seres queridos y tu vehículo con seguimiento GPS en tiempo real. Recibe alertas de velocidad, batería baja y entrada/salida de GeoFence directamente en tu teléfono. Localiza y recupera tu auto cuando lo necesites. EcuaGPS, tu compañero para una conducción más segura. Condiciones de uso (CLUF): https://www.apple.com/legal/internet-services/itunes/dev/stdeula/ Política de privacidad: https://ecuagps.com/index.php/privacy-policy/

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.