This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.
Glycemic Index Load Net Carbs
Take the guesswork out of eating with our AI-powered recipe generator and comprehensive tracking for glucose, blood pressure, and weight—all in one intuitive app designed for your keto or low-carb lifestyle.
Downloads
843K+User Rating
Total Ratings
16K+Publisher
Category
MedicalLocales
17Latest Version
4.3.11Size
44.6 MBFirst Released
Mar 10, 2016Master Your Metabolism with Ease
A comprehensive suite of tools designed to help you manage blood sugar, weight, and blood pressure through data-driven insights and AI-powered meal planning.
AI-Powered Smart Recipes
Take the guesswork out of healthy eating with delicious, personalized recipes tailored to your specific low-carb or keto dietary needs.
Unified Health Dashboard
Seamlessly sync with Apple Health to monitor your glucose, blood pressure, and weight in one place with beautiful, easy-to-read charts.
More Like This
Apps with similar features and user experience
OneTouch Reveal® app
LifeScan, Inc.
Libre by Abbott
Abbott Diabetes Care Inc
mySugr - Diabetes Tracker Log
mySugr GmbH
GoCoCo - Diabetes Food Tracker
Coco positivo SL
Dexcom Clarity
DexCom, Inc.
Glucose | Blood Sugar Tracker
App Sub 1 LLC
Glooko - Track Diabetes Data
Glooko, Inc.
Glucose Buddy Diabetes Tracker
Azumio Inc.
Health2Sync - Diabetes Tracker
H2 Inc.
This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.