Health2Sync - Diabetes Tracker
Health2Sync - Diabetes Tracker
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of Health2Sync - Diabetes Tracker
Download on App Store

Health2Sync - Diabetes Tracker

Master your blood sugar with clinical-grade tracking. Sync with 40+ Bluetooth devices, Apple Health, and Fitbit to generate doctor-ready reports and gain total control over your health.

Key Figures

Downloads

522K+

User Rating

4.7/5

Total Ratings

19K+

Publisher

H2 Inc.

Category

Medical

Locales

6

Latest Version

2.94.0

Size

141.0 MB

First Released

Apr 11, 2014
Features

Master Your Diabetes with Clinical Precision

Join over 1 million users using data-driven insights and seamless device integration to lower A1C levels and simplify daily health tracking.

Effortless Device Syncing

Connect 40+ Bluetooth meters, Fitbit, and Apple Health to eliminate manual logging and see all your data in one streamlined dashboard.

Doctor-Ready Reports

Transform your logs into professional PDF summaries that help your healthcare provider make more informed decisions during your appointments.

FAQ

Frequently Asked Questions

Everything you need to know about Health2Sync - Diabetes Tracker

What is the Health2Sync app?

Health2Sync is a diabetes management app designed to help users track and organize blood sugar, diet, exercise, and medication records. It provides comprehensive analysis and supports data syncing with over 40 Bluetooth devices.

What types of health data can I track with Health2Sync?

You can track blood sugar, blood pressure, weight, food intake, exercise, medication, and over 60 lab test results like A1C and cholesterol with Health2Sync.

Does Health2Sync support syncing with external devices?

Yes, Health2Sync supports syncing with over 40 Bluetooth glucose meters, blood pressure monitors, and weight scales. It also syncs with Fitbit and Apple Health.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

Health2Sync - Diabetes Tracker - Promotional screen for Health2Sync app highlighting easy health management features and over one million users

Promotional screen for Health2Sync app highlighting easy health management features and over one million users

Health2Sync - Diabetes Tracker - Health2Sync app dashboard with logging options for blood sugar blood pressure weight and medication

Health2Sync app dashboard with logging options for blood sugar blood pressure weight and medication

Health2Sync - Diabetes Tracker - AI powered food logging interface showing nutritional data for a chicken sub sandwich

AI powered food logging interface showing nutritional data for a chicken sub sandwich

Health2Sync - Diabetes Tracker - Health2Sync app screen displaying blood glucose and blood pressure progress reports with charts.

Health2Sync app screen displaying blood glucose and blood pressure progress reports with charts.

Health2Sync - Diabetes Tracker - Health2Sync app diary showing blood glucose readings and food photos with a search bar

Health2Sync app diary showing blood glucose readings and food photos with a search bar

Health2Sync - Diabetes Tracker - Health2Sync app interface showing options to automatically sync medical devices like glucose meters and blood pressure monitors.

Health2Sync app interface showing options to automatically sync medical devices like glucose meters and blood pressure monitors.

Health2Sync - Diabetes Tracker - Health2Sync app screen showing the export feature for diabetes health reports in PDF and Excel formats

Health2Sync app screen showing the export feature for diabetes health reports in PDF and Excel formats

Health2Sync - Diabetes Tracker - Health2Sync app screenshot showing family data sharing and blood sugar monitoring support

Health2Sync app screenshot showing family data sharing and blood sugar monitoring support

Description

Selected by Healthline as one of the “Best Diabetes Apps” and featured in Techcrunch, Bloomberg, and MobiHealthNews, Health2Sync makes diabetes and blood sugar management easy for you. With over 1 million users and 10 years of product enhancements, Health2Sync is the go-to app for diabetes that provides all you need to manage your blood sugar in a simple and intuitive way. What can Health2Sync do for you: ● Track and organize all your blood sugar and behavior records in one place ● Learn how your blood sugar movements are related to your diet, exercise habits, and medication use ● Set up a diabetes management plan that makes sense for you ● See your health management progress over time ● Share your data to healthcare providers and family members Key features of Health2Sync: ● Log or sync your blood sugar, blood pressure, and weight readings. Over 40 Bluetooth glucose meters, blood pressure monitors, and weight scales are supported for syncing ● Record food you have eaten, exercises you’ve done, and medication you have taken ● Track over 60 lab test results (such as A1C and cholesterol) and view their trends over time ● View charts and analyses for the various types of data you logged ● Review, search & filter your previous logs ● Receive periodic summaries, feedback/reminders regarding your logs ● Add family members as partners to share your data with them ● Turn your data into a user-friendly PDF report that you can send to yourself or your care provider ● Export your records as Excel. We believe your data belongs to you! ● Sync with Fitbit and Apple Health For information regarding Health2Sync’s effectiveness in A1C and blood glucose control, you can read our peer-reviewed publications below: ● The Effects of Continuous Usage of a Diabetes Management App on Glycemic Control in Real-world Clinical Practice: Retrospective Analysis (https://www.jmir.org/2021/7/e23227) ● Real-world Benefits of Diabetes Management App Use and Self-monitoring of Blood Glucose on Glycemic Control: Retrospective Analyses (https://mhealth.jmir.org/2022/6/e31764) We know that diabetes management can be painful, tiring, and lonely. We really hope Health2Sync can make diabetes management easier and more meaningful to you. For more information about our app and our data syncing capabilities, please go to our website at https://www.health2sync.com. -- Jurisdiction Statement -- Not all devices listed in the Health2Sync app may be available in your country. Find whether your device has regulatory clearance on our website: https://www.health2sync.com/device_list_pdfs/device_availability.pdf Always check with the regulatory authority and/or the device manufacturer for confirmation before connecting your device with the Health2Sync app.

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.