河小象写字-提升拼音分数的神器
河小象写字-提升拼音分数的神器
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of 河小象写字-提升拼音分数的神器
Download on App Store

河小象写字-提升拼音分数的神器

Join 15 million children in the world's leading online calligraphy classroom. Designed by tech experts and university masters to help your child master Chinese characters with just 15 minutes of daily practice and professional feedback.

Key Figures

Downloads

0

User Rating

4.1/5

Total Ratings

0

Publisher

Hangzhou Hexiang Network Technology Co., Ltd.

Category

Education

Locales

1

Latest Version

4.1.14

Size

102.3 MB

First Released

Sep 26, 2018
Features

Empower Your Child's Cultural Journey

Designed for heritage learners, our platform combines professional calligraphy expertise with AI technology to make mastering Chinese writing efficient, fun, and accessible from anywhere in the US.

Efficient 15-Minute Daily Routine

Our proven '10-min practice + 5-min feedback' model fits perfectly into a busy American school schedule, ensuring rapid progress without the burnout.

Elite 1-on-1 Mentorship

Get direct access to professional calligraphy masters who provide personalized feedback, filling the gap of high-quality local instruction for diaspora families.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

河小象写字-提升拼音分数的神器 - Promotional screenshot for He Xiao Xiang Writing version 4.0 showing Chinese calligraphy lessons and daily practice features

Promotional screenshot for He Xiao Xiang Writing version 4.0 showing Chinese calligraphy lessons and daily practice features

河小象写字-提升拼音分数的神器 - Promotional screen for the He Xiao Xiang Writing app showing progressive Chinese calligraphy lessons from basic strokes to full poems with a progress chart

Promotional screen for the He Xiao Xiang Writing app showing progressive Chinese calligraphy lessons from basic strokes to full poems with a progress chart

河小象写字-提升拼音分数的神器 - Screenshot showing teacher corrections and audio feedback on Chinese handwriting practice

Screenshot showing teacher corrections and audio feedback on Chinese handwriting practice

河小象写字-提升拼音分数的神器 - A student evaluation report in the He Xiao Xiang Writing app showing calligraphy level achievements and practice statistics.

A student evaluation report in the He Xiao Xiang Writing app showing calligraphy level achievements and practice statistics.

河小象写字-提升拼音分数的神器 - Chinese calligraphy learning app showing vocabulary and poetry practice tools

Chinese calligraphy learning app showing vocabulary and poetry practice tools

Description

【公司介绍】 以“为孩子提供有效、有趣的普惠教育”为使命,是一个专注3-12岁少儿素质教育的在线教育品牌。 采用“AI+教育”模式,融合图像识别、语音测评、智能匹配、人机交互及大数据分析等创新科技,自主研发课程。以“河小象大语文”为核心产品,同时推出了写字、书法、美术等明星产品,致力于帮助孩子提高综合素养。 河小象已累计获4亿多元融资,用于研发在线课程! 【关于河小象写字】 1500万孩子都在学的在线写字课程。 浙大书法老师、全国知名书法家1V1线上授课。 由原阿里巴巴技术团队打造完善的监督—激励学习系统。 提倡“10分钟练习+5分钟点评”高效高频的练习方式。 课程采个人化定制,内容由浅入深,配备专业老师实时跟踪学习进度。 让孩子写成更好的自己。 功能介绍 【首页】 课表功能:展示每日学习内容,让孩子明确学习目标 作业广场、上墙、榜单:同时间看到其他小朋友学习情况,隐形激励孩子主动写得更好 【学习】 童趣的色彩搭配丰富的兴趣课程,让孩子在不知不觉中学习并培养创造力 【消息】 即时聊天功能,遇到问题及时与老师沟通,反馈快速,问题不过夜 【我的】 记录孩子学习情况,设置勋章奖励,激励孩子自主学习 【关注支持】 微信公众号:河小象 意见反馈邮箱:xiaoxiang@hexiaoxiang.com 公司官网:www.hexiaoxiang.com 客服电话:400-163-3686

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.