灵占算命 - 八字算命星座风水
灵占算命 - 八字算命星座风水
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of 灵占算命 - 八字算命星座风水
Download on App Store

灵占算命 - 八字算命星座风水

The most comprehensive all-in-one spiritual companion. From Bazi and Feng Shui to Tarot and Face Reading, get personalized daily insights to guide your career, love, and life.

Key Figures

Downloads

1M+

User Rating

4.7/5

Total Ratings

6K+

Publisher

C C C Wisdom Co., Ltd

Category

Reference

Locales

3

Latest Version

6.2.3

Size

719.8 MB

First Released

Feb 26, 2012
Features

Decode Your Destiny with Ancient Eastern Wisdom

The most comprehensive suite for Chinese metaphysics. Navigate your life with personalized Bazi charts, daily horoscopes, and time-tested spiritual guidance.

In-Depth Bazi Analysis

Unlock your life's blueprint with professional Eight-Character readings for your career, wealth, and personal growth.

Divine Love Compatibility

Find harmony with five unique pairing modules designed to analyze the spiritual and character synergy between you and your partner.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

灵占算命 - 八字算命星座风水 - Home screen of the Lingzhan Fortune Telling app showing various Chinese divination services like Bazi and face reading

Home screen of the Lingzhan Fortune Telling app showing various Chinese divination services like Bazi and face reading

灵占算命 - 八字算命星座风水 - Lingzhan Fortune Telling app interface showing AI face reading and facial feature analysis for destiny prediction

Lingzhan Fortune Telling app interface showing AI face reading and facial feature analysis for destiny prediction

灵占算命 - 八字算命星座风水 - Lingzhan Fortune Telling app interface for AI palmistry analysis showing a scanned hand with labeled lines

Lingzhan Fortune Telling app interface for AI palmistry analysis showing a scanned hand with labeled lines

灵占算命 - 八字算命星座风水 - A professional astrological natal chart interface in the Lingzhan Fortune Telling app showing zodiac signs and planetary positions

A professional astrological natal chart interface in the Lingzhan Fortune Telling app showing zodiac signs and planetary positions

灵占算命 - 八字算命星座风水 - Lingzhan app interface showing daily fortune ratings for wealth career and love with circular progress charts

Lingzhan app interface showing daily fortune ratings for wealth career and love with circular progress charts

灵占算命 - 八字算命星座风水 - Interface of the virtual cat raising charity feature within the Lingzhan app

Interface of the virtual cat raising charity feature within the Lingzhan app

灵占算命 - 八字算命星座风水 - Lingzhan Fortune Telling app wishing lamp feature with floating lanterns under a crescent moon

Lingzhan Fortune Telling app wishing lamp feature with floating lanterns under a crescent moon

灵占算命 - 八字算命星座风水 - Tarot card selection interface for predicting future love life in the Lingzhan app

Tarot card selection interface for predicting future love life in the Lingzhan app

灵占算命 - 八字算命星座风水 - Lingzhan app screen showing a face aging prediction feature with a woman at age 20 and age 80 for fortune telling purposes

Lingzhan app screen showing a face aging prediction feature with a woman at age 20 and age 80 for fortune telling purposes

灵占算命 - 八字算命星座风水 - A serene night landscape in the Lingzhan app featuring a river with floating lanterns and traditional Chinese architecture under a full moon.

A serene night landscape in the Lingzhan app featuring a river with floating lanterns and traditional Chinese architecture under a full moon.

Description

灵占算命星座是一款内容全面、简洁易用、极具中国风的应用。 【灵占算命】功能简介: • 八字算命:融合了命宫、称骨算命等八字占卜算命相关理论,用通俗易懂的言语概述您的五行命理,包含了配偶相貌、流年大运、财运,婚姻,事业等方面。 • 塔罗牌:占卜您未来的爱情生活,为您的选择提供参考建议。 • 周公解梦:梦文化是中国古代文化中不可缺少的重要组成部分,在此可通过您梦到的种种意象为您解读梦境,帮您预测吉凶。 • 卜卦断事:此功能包含蓍草卜卦、龟壳卜卦、铜钱卜卦,灵占将最传统的卜卦方式重现于用户。 • 星座合盘:通过星盘分析,全方位解读您与另一伴的恋爱关系。 • 每日星座运势:每日运势结合个人生辰八字信息,打造专属个人的综合运势、财运、事业运、桃花运等。 • 生肖大运:包含综合运势分析,各年详批及每月运程来解读新的一年中十二生肖的各方面运势走向,为您提供参考。 • 爱情配对:主要包含八字综合合婚、血型配对、星座配对、名字配对、生肖配对五个模块,从不同的方向跟角度来预判男女双方性格等是否合适,结论仅可做为参考。 • 测字断事:当您在为某件事犹豫不决之时,可用测字断事功能,来为您断事做参考。 • 面相分析:通过对您的脸型、眼、眉、鼻、嘴进行分析算命。 • 三生三世:根据您的生辰八字为您测算前世、今生及来世的命运。 • 三世姻缘:以双方生辰八字为基础,勾勒出您与他之间前世、今生及来世。 • 痣相图解:许多人脸上或者身体的某个位置长有痣,有些痣包含一定的寓意,我们通过中国古老的痣相图,来解读痣对于人性格命运的影响,极具参考价值。 • 掌纹秘密:此模块包含有指纹算命与掌纹秘密功能,根据您手掌和手指上的纹路来推测您的命理及相关的性格特征。 • 黄历日历:此功能包含万年历黄历等相关信息,还可根据生辰八字等相关信息用户提供每日宜吉,专属择日等功能。 • 姓名解析:通过对您的姓名及生辰八字进行剖析,发现您姓名中的秘密,知晓名字对人一生的影响。 • 民俗杂项:除了以上功能还包含民间常用的号码测算、眼跳预测(眼跳,耳热,心惊,面热,喷嚏等)、玄空风水等八字算命占卜相关的功能。 感谢大家的使用与支持,我们将再接再厉,为您提供满意周到的服务。

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.