This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.
MSD Manual Guide to Obstetrics
Empowering healthcare professionals with evidence-based protocols, instructional videos, and essential tools for pregnancy, labor, and newborn care—completely free and accessible offline.
Downloads
47K+User Rating
Total Ratings
0Publisher
Category
MedicalLocales
1Latest Version
2.0.2Size
183.1 MBFirst Released
Apr 6, 2020Trusted Clinical Guidance for Every Stage of Pregnancy
Empower your practice with peer-reviewed obstetric insights, instructional videos, and essential bedside tools—always free and accessible offline.
Comprehensive Clinical Reference
Navigate 99 expert-vetted topics covering everything from prenatal care and high-risk pregnancy to complex labor and delivery protocols.
Step-by-Step Clinical Videos
Visualize life-saving procedures with 14 instructional videos on newborn resuscitation, postpartum hemorrhage management, and complicated deliveries.
More Like This
Top-ranked apps in the same category
国家医保服务平台
National Healthcare Security Administration
MyChart
Epic Systems Corporation
Doctolib - Your health partner
Doctolib
Pregnancy + | Tracker App
Philips Digital UK Limited
CVS Health
CVS Pharmacy
江苏医保云
Jiangsu Healthcare Security Bureau
UnitedHealthcare
UNITED HEALTHCARE SERVICES, INC.
京东健康
BEIJING JINGDONG 360 DU E-COMMERCE LTD.
Meu SUS Digital
Servicos e Informacoes do Brasil
This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.