自定义水印相机
自定义水印相机
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of 自定义水印相机
Download on App Store

自定义水印相机

Automate your site reports with precise GPS, time-stamping, and custom work templates. The essential tool for engineers, inspectors, and logistics professionals to capture verified proof of work.

Key Figures

Downloads

1M+

User Rating

4.9/5

Total Ratings

74K+

Publisher

Beidou Hanglu Technology Co.,Ltd.

Category

Photo & Video

Locales

2

Latest Version

2.2.67

Size

110.5 MB

First Released

Jan 26, 2021
Features

Professional Proof in Every Frame

The all-in-one field camera designed for contractors, engineers, and logistics professionals who need reliable, high-precision documentation.

Automatic GPS & Time Stamps

Generate tamper-proof evidence with real-time location, longitude, and precise timestamps for every site visit.

Specialized Industry Templates

Streamline your workflow with professional overlays designed specifically for construction, logistics, and property inspections.

FAQ

Frequently Asked Questions

Everything you need to know about 自定义水印相机

Can users customize the time and location in watermarks with the Custom Watermark Camera app?

Yes, users can modify the time and location on watermarks. The Custom Watermark Camera app supports custom addresses and specific times, ensuring accurate photo records.

Does the Custom Watermark Camera app provide video watermarking capabilities?

Yes, the Custom Watermark Camera app offers video watermarking. It records video progress, adding real-time GPS location, address, time, date, coordinates, altitude, and weather information.

What types of watermark templates are available in the Custom Watermark Camera app?

The Custom Watermark Camera app offers diverse watermark templates. These include time, location, weather, coordinates, cartoon, festival, and punch-in styles, suitable for various work and life scenarios.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

自定义水印相机 - Interface of a watermark camera app with options to customize time and location metadata on photos

Interface of a watermark camera app with options to customize time and location metadata on photos

自定义水印相机 - Mobile app screen showing batch watermarking functionality with customizable time interval settings for a photo gallery

Mobile app screen showing batch watermarking functionality with customizable time interval settings for a photo gallery

自定义水印相机 - Mobile app screen showing video recording of a construction site with a professional watermark overlay including GPS coordinates and project data

Mobile app screen showing video recording of a construction site with a professional watermark overlay including GPS coordinates and project data

自定义水印相机 - Professional watermark camera app interface featuring a library of customizable engineering and location templates for site documentation.

Professional watermark camera app interface featuring a library of customizable engineering and location templates for site documentation.

自定义水印相机 - Interface of a professional watermark camera app showing customization options for time location GPS and weather metadata

Interface of a professional watermark camera app showing customization options for time location GPS and weather metadata

Description

志定义水印相机,自定义水印相机--支持时间地点可改的免费水印拍照相机APP,志定义水印相机拍照即自动加水印。海量水印模板,轻松拍照,时间定位精准,支持自定义修改,百万基层工作团队的工作拍照相机选择。 【修改水印】水印照片自动生成;水印相机免费修改,水印相机就用水印相机专业版!一键获取当前时间地点作为水印,帮助用户拍照打卡! 【水印模板丰富】 时间地点水印、天气水印、经纬水印、卡通水印、春节水印、打卡水印等多套模板,真实还原多种工作和生活场景,满足不同相机用户对水印样式的需求,选择即可,操作简单,拍照成图不过1分钟。 【时间定位精准】 相机多种打卡专属水印模板,对标北京时间,精准锁定当前位置,轻松打卡,真实记录即刻工作与生活。相机水印时间、定位实时更新,自动更新,无需其他赘余操作。 【认证拍照真实】 相机认证拍照模式,自动对焦,精准拍照,帮助您一键生成高质认证照片,图片给到认证编号、二维码、真实的时间和地图定位,直接分享。 【适用场景广泛】 适于项目巡检、生活打卡、外勤拍照、工程管理、微商电商等多场景工作拍照、打卡、记录所需,记录健康。另持续推出创意水印,支持乐享生活的人们旅游打卡、探店打卡、健身打卡! 【水印相机选我】 选好水印、一键拍照,水印照片自动生成;水印相机样式丰富多彩,让你的照片更时尚,朋友圈更出彩;爱生活爱记录就选水印打卡相机!一键获取当前时间地点作为水印,帮助用户拍照打卡! 【经纬度相机】 现场拍摄 真实水印 支持现场图片/视频拍摄实时gps定位,自动添加地址、时间日期、经纬度、海拔、天气、IMEI、手机号等水印; 【工程相机】 工程施工拍照管理应用,按照工程及施工地点管理施工照片的水印相机;在照片上添加水印:做施工记号,记录经纬度、海拔、方位角度、地理位置、天气、工程信息及自定义备注等,适用于市政工程、交通工程、电力工程、天网工程、土建工程、园林绿化、市政道路清扫保洁、市政设施施工、装修施工、建筑施工等各种工程的拍照分类归档。 【水印相机-时间地点和工作水印】 您可以选择不同的水印模版,拍摄符合您要求的水印照片,您可以在照片上添加自定义的时间,地点,天气,二元道路坐标精确到经纬度,是各行业工作人员外出必备APP。 【货车物流水印】 货主、车主、司机、第三方物流(货代)专用水印相机

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.