Findus-安心守护日常自动报备
Findus-安心守护日常自动报备
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of Findus-安心守护日常自动报备
Download on App Store

Findus-安心守护日常自动报备

Stop guessing. Findus delivers radical transparency, offering a direct line into your trusted circle's every move and digital pulse.

Key Figures

Downloads

50k+

User Rating

4.0/5

Total Ratings

210

Publisher

Chongqing Wanyijia Technology Co., Ltd.

Category

Lifestyle

Locales

1

Latest Version

1.0.4

Size

81.5 MB

First Released

Sep 23, 2025
Features

An in-depth evaluation of key functionalities designed for enhanced mutual transparency and connection within trusted relationships.

Feature Analysis: Findus - Secure Daily Auto Reporting

Real-time Location Tracking

The app enables users to view their partner's live location, distance, and movement status, fostering a constant sense of connection and reducing anxiety about their whereabouts.

Automatic Status Reporting

This tool provides automated alerts for significant status changes such as location disabling, network shifts, low battery, or arrival/departure from predefined places, significantly enhancing safety and continuous awareness.

Historical Location Playback

It allows users to review their partner's travel history, including routes, modes of transport, speed, and time spent at various locations for up to 7 days, providing comprehensive oversight and reassurance.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

Findus-安心守护日常自动报备 - The app provides a detailed timeline of daily movements and a clear calendar interface for reviewing past locations, ensuring users are always informed about their loved ones' whereabouts.

The app provides a detailed timeline of daily movements and a clear calendar interface for reviewing past locations, ensuring users are always informed about their loved ones' whereabouts.

Daily Movement Insights

Findus-安心守护日常自动报备 - This tool keeps users instantly updated with automatic notifications covering device status changes like battery levels and connectivity, alongside precise location updates.

This tool keeps users instantly updated with automatic notifications covering device status changes like battery levels and connectivity, alongside precise location updates.

Smart Activity Alerts

Findus-安心守护日常自动报备 - Users gain comprehensive oversight with a real-time distance display and detailed phone usage reports, showcasing screen time and unlock counts for mutual transparency.

Users gain comprehensive oversight with a real-time distance display and detailed phone usage reports, showcasing screen time and unlock counts for mutual transparency.

Comprehensive Status View

Findus-安心守护日常自动报备 - The app meticulously logs all incoming and outgoing calls, displaying precise call durations and timestamps to offer a complete communication overview.

The app meticulously logs all incoming and outgoing calls, displaying precise call durations and timestamps to offer a complete communication overview.

Call Log Insights

Description

Findus,实时报备日常轨迹,共享手机使用记录,让彼此联系更紧密,守护更安心! —— 核心功能 —— 【查看实时位置】 无论和Ta相隔多远,都能实时查看彼此距离、对方位置和运动状态,一起共享不孤单~ 【历史轨迹回看】 全天候共享行程足迹和出行方式,速度与停留时间尽在掌握,可查询最近7天记录,让关心和守护时刻在线~ 【手机使用报告】 全时段get对方的手机屏幕使用时长、解锁次数,互相共享健康用机! 【共享手机状态】 共享手机状态,对方的网络状态/流量使用/当前电量/手机存储等设备信息~ 【记录自动报备】 关定位、网络变更、电量告急、上车下车、离开到达?多种状态变化任意查看,让安全感爆满~ 【通话记录统计】 捕捉Ta的每一次来电和去电记录,自动统计每日通话次数和通话时长! 【自动订阅会员说明】 1.订阅周期:1个月(连续包月会员),3个月(连续包季会员),12个月(连续包年会员) 2.订阅价格:双人连续包月产品为每月32元,双人连续包季产品为每季62元,双人连续包年产品为每年118元,最终以页面展示为准。 3.会员支付:用户确认购买并付款后将支付到iTunes账户,会在订阅周期到期前24小时,自动在iTunes账户扣费并延长一个订阅周期会员有效期。 4.取消续订:如需取消订阅,请在当前订阅周期到期前24小时以前,手动在“设置”―>进入“iTunes Store与App Store”―>点击"Apple ID",进入账户设置页面,选择取消订阅即可。如未在订阅期结束的至少24小时前关闭订阅,此订阅将会自动续订。 用户协议:https://www.findusapp.cn/agreement/user/index.html 隐私协议:https://www.findusapp.cn/agreement/privacy/index.html 会员服务协议:https://www.findusapp.cn/agreement/vip/index.html —— 温馨提示 —— 所有信息共享都需要双方主动授权才可以使用哦。 定位轨迹共享会持续使用GPS定位服务,切换至后台仍然会保持GPS连接,相比其它操作会消耗更多的电量,会影响电池续航时间。

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.