Setellite
Setellite
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of Setellite
Download on App Store

Setellite

The most trusted platform for VFX wranglers and supervisors to capture, manage, and share critical shot data. Built for the high-pressure environment of film sets, Setellite works flawlessly offline and syncs your project the moment you're back online.

Key Figures

Downloads

600

User Rating

1.8/5

Total Ratings

0

Publisher

PLX Technologies B.V.

Category

Productivity

Locales

1

Latest Version

3.5.10

Size

54.6 MB

First Released

Dec 18, 2015
Features

Engineered for the Modern VFX Workflow

The industry standard for capturing, organizing, and syncing critical VFX data, ensuring a seamless bridge from the film set to the post-production studio.

Robust Offline Functionality

Capture essential shot data in any environment without needing a connection; your work syncs automatically once you are back online.

Precision Digital Forms

Replace manual notes with standardized forms for slates and takes, designed to eliminate human error and maintain data integrity.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

Setellite - Promotional graphic for Setellite VFX data wrangling app showing its iPad interface on a film set

Promotional graphic for Setellite VFX data wrangling app showing its iPad interface on a film set

Setellite - Setellite iPad app project dashboard displaying film technical specifications and navigation tiles for VFX data management.

Setellite iPad app project dashboard displaying film technical specifications and navigation tiles for VFX data management.

Setellite - Setellite iPad app interface showing project synchronization management settings.

Setellite iPad app interface showing project synchronization management settings.

Setellite - Setellite app interface on an iPad displaying VFX camera data and film production settings.

Setellite app interface on an iPad displaying VFX camera data and film production settings.

Setellite - VFX data entry interface on Setellite iPad app showing camera and lens settings

VFX data entry interface on Setellite iPad app showing camera and lens settings

Setellite - Setellite app interface showing VFX data references and green screen shot on iPad

Setellite app interface showing VFX data references and green screen shot on iPad

Setellite - The Setellite iPad app displaying a finished export message and a PDF preview of a VFX shot data report.

The Setellite iPad app displaying a finished export message and a PDF preview of a VFX shot data report.

Setellite - Interface of Setellite app on iPad showing various data export formats like JSON, CSV, PDF, and ShotGrid.

Interface of Setellite app on iPad showing various data export formats like JSON, CSV, PDF, and ShotGrid.

Description

Since 2012, Setellite has set the standard as the most widely used platform for on-set VFX data organization. Setellite offers VFX data wranglers, VFX supervisors and production crews extensive productivity and real-time collaborative project sharing solutions to quickly and efficiently collect critical on-set (VFX) shot data that can be easily modified and shared with key stakeholders before, during, and after production. Setellite is built around the concept of creating digital forms and is fully compatible with the system of slates and takes used on any film set throughout the world, whether you shoot for features or episodic. Setellite does not require an active (data) connection to collect on-set data. However, certain functionalities such as initial project syncing (downloading data to the device) and security measures (f.i. 2FA, depending on your preferences) might need temporary connectivity. When offline, syncing between your project and the website (or with other users) is suspended, but will resume as soon as a connection is available.

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.