Kaliti for iPad
Kaliti for iPad
Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.

Logo of Kaliti for iPad
Download on App Store

Kaliti for iPad

The all-in-one collaborative platform for construction leaders to manage snags, conduct inspections, and streamline project delivery from structural work to after-sales.

Key Figures

Downloads

14K+

User Rating

3.4/5

Total Ratings

100

Publisher

KALITI

Category

Utilities

Locales

7

Latest Version

4.70.6

Size

159.3 MB

First Released

Dec 2, 2011
Features

Master Every Phase of the Build

Save up to 70% of your time with an all-in-one digital workspace designed for the field. Manage snags, inspections, and stakeholders with professional precision directly from your iPad.

Seamless Snagging & Punch Lists

Pin observations directly to digital floor plans and collaborate in real-time. Turn hours of manual paperwork into minutes of digital precision.

Your Office, Anywhere

Access blueprints and site documents on the move. Generate professional PDF reports instantly on-site to keep stakeholders aligned.

The following screenshots and description are sourced directly from the app's official store listing and are the property of the app developer.

App Store

Screenshots

Kaliti for iPad - Construction site floor plan and project status list in Kaliti for iPad

Construction site floor plan and project status list in Kaliti for iPad

Kaliti for iPad - Digital floor plan on iPad with numbered pins corresponding to a site observation list

Digital floor plan on iPad with numbered pins corresponding to a site observation list

Kaliti for iPad - Construction site inspection and self-check interface on the Kaliti iPad app

Construction site inspection and self-check interface on the Kaliti iPad app

Kaliti for iPad - Kaliti iPad app dashboard showing construction project statistics and snag list progress with pie charts

Kaliti iPad app dashboard showing construction project statistics and snag list progress with pie charts

Kaliti for iPad - Stacked bar chart in the Kaliti app displaying construction project statistics and snag list status by floor level

Stacked bar chart in the Kaliti app displaying construction project statistics and snag list status by floor level

Description

Kaliti is a professional site management application Save up to 70% of time on all the steps of the site, from structural work to after-sales service with the functionalities available according to your wishes. FEATURES: - Create and manage efficiently your observations and snags thanks to our totally collaborative tool between the various actors of the site - Easily carry out your inspections on the site whatever the phase: self-checks, vouchers to be closed, reception of supports, non-conformities, and share the results - Access your documents at any time while on the move (CCTP, market documents, etc.) - Monitor the progress of the work - Carry out your site reports directly on Kaliti, adapting it to your needs - Analyze your data with our statistics tool (global vision, synthesis, progress) - For rehabilitation projects in occupied areas, manage your tenants and generate inventory and worksheets - Effectively manage your buyers with integrated choice management and Modifying works, then generate your delivery reports and satisfaction surveys - During the structural work phase, use the structural work rotations monitoring tool by planning and pointing the works carried out on Kaliti in order to optimize your productivity COMMUNICATION - Easily export your snag reports filtered as desired in PDF or Excel formats. kaliti, building sites, opr, btp, reserve, seizure, lifting, building, works, quality, opl, gpa, moe, mo, construction - Export your control sheets or the summary of all the sheets MULTI-PROJECT STATISTICS - Generate statistical reports with all your projects via our transversal analysis

Download

Download on App Store

This page is not an official page of the app or its developer, but an independent editorial publication created for informational and commentary purposes. Unless expressly stated otherwise, neither the app nor its developer is affiliated with, endorsed by, sponsored by, authorized by, or otherwise officially connected with MWM, Apple, Google Play, the app publisher, or the app's developer, and nothing on this page implies that the app was developed using MWM's services. Any trademarks, logos, screenshots, and other content remain the property of their respective owners.